Benefits of New Digital Solution and Workflow Applied to Fast Track Subsea Development

Bruno Jesus Romero Mora, Beatrice Ioannilli, Sam Stobart, M. Gassert, Tommaso Castellito, S. Sartirana, V. Calabrese, Arturo Belleza, J. Ballotta, F. Duclocher, G. Citi, Darrell Knight, Jostein Lien
{"title":"Benefits of New Digital Solution and Workflow Applied to Fast Track Subsea Development","authors":"Bruno Jesus Romero Mora, Beatrice Ioannilli, Sam Stobart, M. Gassert, Tommaso Castellito, S. Sartirana, V. Calabrese, Arturo Belleza, J. Ballotta, F. Duclocher, G. Citi, Darrell Knight, Jostein Lien","doi":"10.2118/200054-ms","DOIUrl":null,"url":null,"abstract":"\n An Eni initiative Fast 3Digital Subsea was made to identify opportunities for improving Company's Subsea developments in terms of time, quality and cost by applying a new way of working and implementing a new digital tool, the FieldAP/Fieldtwin platform (by FutureOn).\n The purpose of this paper is to present the results of the comparison made between the conventional way of working and the application of the Fast 3Digital Subsea on subsea tieback projects. Data was collected and analysed for a project using the Fast 3Digital Subsea and the results showed the following key success benefits for Eni projects: time saving, cost reduction and improvement in engineering, quality and safety.\n The benefits listed above were proved during the engineering phase of the project, however the Fast 3Digital Subsea is expected to lead to similar improvements for the future phases of the projects such as installation, commissioning, maintenance and operation. From a Project point of view, the digital solution is expected to lead to minimum time savings of between 1-2 months from discovery to First Oil.\n This 1-2 months saving are expected mainly in projects where the critical path is represented by subsea items / flowlines that could benefit from an early procurement, in particular tie-backs to existing facilities (FPSO, FPU, and Onshore Plants).\n For this paper, an Eni project was chosen as the base case and the impacts on project schedule, cost, quality, and discipline collaboration during the engineering, feasibility and FEED activities were evaluated.\n The Fast 3Digital Subsea allowed engineers to evaluate multiple scenarios more effectively, increased the quality on the project documentation, allowed to select the optimum field layout configuration at an early stage and to quickly prepare an ITT package. All of the above, showed an average time saving of approximately 30% on field layout preparation, therefore cost saving compared to the conventional way of working were realised.\n Another significant time saving obtained by implementing a Fast 3Digital Subsea approach was during creating of overall deliverables with time saving of nearly 60% during Pre-FEED activities.\n All of time savings are broken down in activities and are described in the results section.\n In terms of marine operation, the selected digital solution allows engineers to assess the subsea deveolopment by visualising geohazards and clashes during SIMOPS, this aspect adds singnificant value to projects for faster decision making whilst taking into consideration safety.","PeriodicalId":10912,"journal":{"name":"Day 3 Wed, March 23, 2022","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-03-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, March 23, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/200054-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

An Eni initiative Fast 3Digital Subsea was made to identify opportunities for improving Company's Subsea developments in terms of time, quality and cost by applying a new way of working and implementing a new digital tool, the FieldAP/Fieldtwin platform (by FutureOn). The purpose of this paper is to present the results of the comparison made between the conventional way of working and the application of the Fast 3Digital Subsea on subsea tieback projects. Data was collected and analysed for a project using the Fast 3Digital Subsea and the results showed the following key success benefits for Eni projects: time saving, cost reduction and improvement in engineering, quality and safety. The benefits listed above were proved during the engineering phase of the project, however the Fast 3Digital Subsea is expected to lead to similar improvements for the future phases of the projects such as installation, commissioning, maintenance and operation. From a Project point of view, the digital solution is expected to lead to minimum time savings of between 1-2 months from discovery to First Oil. This 1-2 months saving are expected mainly in projects where the critical path is represented by subsea items / flowlines that could benefit from an early procurement, in particular tie-backs to existing facilities (FPSO, FPU, and Onshore Plants). For this paper, an Eni project was chosen as the base case and the impacts on project schedule, cost, quality, and discipline collaboration during the engineering, feasibility and FEED activities were evaluated. The Fast 3Digital Subsea allowed engineers to evaluate multiple scenarios more effectively, increased the quality on the project documentation, allowed to select the optimum field layout configuration at an early stage and to quickly prepare an ITT package. All of the above, showed an average time saving of approximately 30% on field layout preparation, therefore cost saving compared to the conventional way of working were realised. Another significant time saving obtained by implementing a Fast 3Digital Subsea approach was during creating of overall deliverables with time saving of nearly 60% during Pre-FEED activities. All of time savings are broken down in activities and are described in the results section. In terms of marine operation, the selected digital solution allows engineers to assess the subsea deveolopment by visualising geohazards and clashes during SIMOPS, this aspect adds singnificant value to projects for faster decision making whilst taking into consideration safety.
新数字解决方案和工作流程应用于快速跟踪海底开发的好处
埃尼公司提出了一项名为Fast 3Digital Subsea的倡议,旨在通过应用新的工作方式和实施新的数字工具FieldAP/Fieldtwin平台(由FutureOn公司开发),在时间、质量和成本方面寻找改善公司海底开发的机会。本文的目的是介绍Fast 3Digital Subsea在海底回接项目中的应用与传统工作方式的比较结果。使用Fast 3Digital Subsea收集和分析了一个项目的数据,结果显示了Eni项目的以下关键成功优势:节省时间,降低成本,改善工程,质量和安全。上述优点在项目的工程阶段得到了证明,而Fast 3Digital Subsea有望在项目的未来阶段(如安装、调试、维护和运营)带来类似的改进。从项目的角度来看,数字解决方案预计将从发现到第一油田节省至少1-2个月的时间。这一1-2个月的节省主要用于关键路径由海底设备/管线代表的项目,这些项目可以从早期采购中受益,特别是与现有设施(FPSO、FPU和陆上工厂)的回接。本文选择一个Eni项目作为基本案例,并评估了工程、可行性和FEED活动期间对项目进度、成本、质量和学科协作的影响。Fast 3Digital Subsea使工程师能够更有效地评估多种方案,提高项目文档的质量,允许在早期阶段选择最佳的现场布局配置,并快速准备ITT包。所有这些都表明,在现场布置准备方面平均节省了约30%的时间,因此与传统的工作方式相比,实现了成本节约。通过实施Fast 3Digital Subsea方法,还可以节省大量时间,在Pre-FEED活动期间,可以节省近60%的时间。所有节省的时间都在活动中进行分解,并在结果部分中进行描述。在海上作业方面,所选择的数字解决方案允许工程师通过可视化SIMOPS期间的地质灾害和冲突来评估海底开发,这方面为项目增加了重要价值,可以在考虑安全的同时更快地做出决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信