How a multidisciplinary team improved a process to attain positive patient outcome

Richard Maki RNC, MHSA
{"title":"How a multidisciplinary team improved a process to attain positive patient outcome","authors":"Richard Maki RNC, MHSA","doi":"10.1067/min.2000.104322","DOIUrl":null,"url":null,"abstract":"<div><p>A case study approach will be used to demonstrate the effectiveness of a continuous quality improvement team designed to explore the process of preoperative medical record completeness. The goal of this team was to improve essential chart components (eg, electrocardiography, history and physical examination) required 48 hours before the date of surgery in an effort to facilitate optimum patient management and timely flow of patients to the operating room. When the 48-hour compliance rule is followed, the nurse reviewer has sufficient time to review all patient data and notify attending physicians or designees of any abnormalities. In essence, improving component compliance provides better quality care because patients are able to be assessed before surgery with enough time to solve any problems. (Insight - the Journal of the American Society of Ophthalmic Registered Nurses 2000;25:50–4.)</p></div>","PeriodicalId":100677,"journal":{"name":"Insight - the Journal of the American Society of Ophthalmic Registered Nurses","volume":"25 2","pages":"Pages 50-54"},"PeriodicalIF":0.0000,"publicationDate":"2000-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1067/min.2000.104322","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Insight - the Journal of the American Society of Ophthalmic Registered Nurses","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1060135X00526517","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2002/5/25 0:00:00","PubModel":"Epub","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A case study approach will be used to demonstrate the effectiveness of a continuous quality improvement team designed to explore the process of preoperative medical record completeness. The goal of this team was to improve essential chart components (eg, electrocardiography, history and physical examination) required 48 hours before the date of surgery in an effort to facilitate optimum patient management and timely flow of patients to the operating room. When the 48-hour compliance rule is followed, the nurse reviewer has sufficient time to review all patient data and notify attending physicians or designees of any abnormalities. In essence, improving component compliance provides better quality care because patients are able to be assessed before surgery with enough time to solve any problems. (Insight - the Journal of the American Society of Ophthalmic Registered Nurses 2000;25:50–4.)

一个多学科团队如何改进一个过程以获得积极的患者结果
一个案例研究方法将被用来证明一个持续质量改进小组的有效性,该小组旨在探索术前医疗记录完整性的过程。该团队的目标是改善手术前48小时所需的基本图表组件(如心电图、病史和体格检查),以促进最佳的患者管理和及时的患者流向手术室。当遵守48小时合规规则时,护士审查员有足够的时间审查所有患者数据,并通知主治医生或指定人员任何异常情况。本质上,提高组件依从性提供了更好的质量护理,因为患者能够在手术前进行评估,有足够的时间来解决任何问题。(Insight -美国眼科注册护士学会杂志2000;25:50-4)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书