异型结构装配式地铁车站装配段与现浇段接驳施工技术

衣 旭, 郭 海洋, 何 思亮
{"title":"异型结构装配式地铁车站装配段与现浇段接驳施工技术","authors":"衣 旭, 郭 海洋, 何 思亮","doi":"10.26789/jzjg.v7i4.1279","DOIUrl":null,"url":null,"abstract":"随着中国城市轨道交通的快速发展,传统现浇地铁车站施工工期长、成品质量较难控制、施工污染较大的问题也随之暴露出来;预制装配式地铁车站应运而生,既满足了生产方式工厂化,又保障了建造精度与产品质量,劳动力需求降低近80%,现场几乎无建筑垃圾,同年即可完成土方开挖、基坑支护、主体结构的全部内容,可以大大地节省施工工期。但由于盾构吊装段需预留吊装孔洞,无法预制,故设计为现浇结构,因此现浇段与装配段接驳处的接驳施工尤为重要,本技术便为此提供了较好思路。","PeriodicalId":67191,"journal":{"name":"建筑结构","volume":"6 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"建筑结构","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.26789/jzjg.v7i4.1279","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

随着中国城市轨道交通的快速发展,传统现浇地铁车站施工工期长、成品质量较难控制、施工污染较大的问题也随之暴露出来;预制装配式地铁车站应运而生,既满足了生产方式工厂化,又保障了建造精度与产品质量,劳动力需求降低近80%,现场几乎无建筑垃圾,同年即可完成土方开挖、基坑支护、主体结构的全部内容,可以大大地节省施工工期。但由于盾构吊装段需预留吊装孔洞,无法预制,故设计为现浇结构,因此现浇段与装配段接驳处的接驳施工尤为重要,本技术便为此提供了较好思路。
异型结构装配式地铁车站装配段与现浇段接驳施工技术
随着中国城市轨道交通的快速发展,传统现浇地铁车站施工工期长、成品质量较难控制、施工污染较大的问题也随之暴露出来;预制装配式地铁车站应运而生,既满足了生产方式工厂化,又保障了建造精度与产品质量,劳动力需求降低近80%,现场几乎无建筑垃圾,同年即可完成土方开挖、基坑支护、主体结构的全部内容,可以大大地节省施工工期。但由于盾构吊装段需预留吊装孔洞,无法预制,故设计为现浇结构,因此现浇段与装配段接驳处的接驳施工尤为重要,本技术便为此提供了较好思路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
20031
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信