{"title":"Renovation Process Challenges and Barriers","authors":"T. Konstantinou, A. Prieto, Tatiana Armijos-Moya","doi":"10.3390/environsciproc2021011006","DOIUrl":null,"url":null,"abstract":"The implementation of Nearly Zero-Energy Buildings (NZEB) renovation packages in Europe needs to be accelerated to meet the decarbonisation goals. To achieve this level of performance, building renovation strategies should shift towards industrialised solutions that incorporate a multitude of passive and active components, increasing the complexity and cost of the execution. Moreover, it requires the involvement of different stakeholders of the building supply chain, resulting in additional difficulties in communication and coordination. To address this challenge, this study aims at mapping the renovation process and at addressing the respective bottlenecks. The objective is to identify the type of information that the stakeholders require during the different renovation phases and provide a framework to structure the workflow between all actors. By structuring the information along the renovation process phases, the different stakeholders can identify when the information can be provided and how the different types of information link to each other.","PeriodicalId":11904,"journal":{"name":"Environmental Sciences Proceedings","volume":"41 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-11-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environmental Sciences Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/environsciproc2021011006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The implementation of Nearly Zero-Energy Buildings (NZEB) renovation packages in Europe needs to be accelerated to meet the decarbonisation goals. To achieve this level of performance, building renovation strategies should shift towards industrialised solutions that incorporate a multitude of passive and active components, increasing the complexity and cost of the execution. Moreover, it requires the involvement of different stakeholders of the building supply chain, resulting in additional difficulties in communication and coordination. To address this challenge, this study aims at mapping the renovation process and at addressing the respective bottlenecks. The objective is to identify the type of information that the stakeholders require during the different renovation phases and provide a framework to structure the workflow between all actors. By structuring the information along the renovation process phases, the different stakeholders can identify when the information can be provided and how the different types of information link to each other.