Total Loss of Feedwater Analysis of PWR Using RELAP5

IF 0.5 Q4 NUCLEAR SCIENCE & TECHNOLOGY
A. Prošek
{"title":"Total Loss of Feedwater Analysis of PWR Using RELAP5","authors":"A. Prošek","doi":"10.1115/1.4063009","DOIUrl":null,"url":null,"abstract":"\n In Europe the design extension conditions (DEC) were introduced after the Fukushima Dai-ichi accident as preferred method for giving due consideration to the complex sequences and severe accidents without including them in the design basis conditions. The objective of the study is to determine available elapsed time before core uncovery and needed DEC safety features for total loss of all feedwater (TLOFW) in a two-loop pressurized water reactor. RELAP5/MOD3.3 computer code has been used for calculations. The initiating event for TLOFW are multiple failures in which, besides the loss of main feedwater also the auxiliary feedwater is lost. The scenarios without DEC safety features and the scenarios with DEC safety features assumed have been simulated.\n The results showed that after TLOFW event initiation it is very important to trip the reactor as soon as possible. In case of loss of offsite power the reactor coolant pumps stop and the reactor very quickly trips on low reactor coolant pump flow. When normal operation systems are assumed the reactor trip occurs on low-low steam generator narrow level few tens of seconds after accident initiation, resulting in less time available before core uncovery occurence. The results for TLOFW scenarios with normal operation systems and DEC safety featured assumed demonstrated that secondary side bleed and feed can prevent core uncovery in case when no operator actions are credited before 30 minute. When primary side bleed and feed is used, less time is available for operator actions.","PeriodicalId":16756,"journal":{"name":"Journal of Nuclear Engineering and Radiation Science","volume":null,"pages":null},"PeriodicalIF":0.5000,"publicationDate":"2023-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Nuclear Engineering and Radiation Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/1.4063009","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

In Europe the design extension conditions (DEC) were introduced after the Fukushima Dai-ichi accident as preferred method for giving due consideration to the complex sequences and severe accidents without including them in the design basis conditions. The objective of the study is to determine available elapsed time before core uncovery and needed DEC safety features for total loss of all feedwater (TLOFW) in a two-loop pressurized water reactor. RELAP5/MOD3.3 computer code has been used for calculations. The initiating event for TLOFW are multiple failures in which, besides the loss of main feedwater also the auxiliary feedwater is lost. The scenarios without DEC safety features and the scenarios with DEC safety features assumed have been simulated. The results showed that after TLOFW event initiation it is very important to trip the reactor as soon as possible. In case of loss of offsite power the reactor coolant pumps stop and the reactor very quickly trips on low reactor coolant pump flow. When normal operation systems are assumed the reactor trip occurs on low-low steam generator narrow level few tens of seconds after accident initiation, resulting in less time available before core uncovery occurence. The results for TLOFW scenarios with normal operation systems and DEC safety featured assumed demonstrated that secondary side bleed and feed can prevent core uncovery in case when no operator actions are credited before 30 minute. When primary side bleed and feed is used, less time is available for operator actions.
利用RELAP5分析压水堆给水总损失
在欧洲,设计延伸条件(DEC)是在福岛第一核电站事故后引入的,作为考虑复杂序列和严重事故而不将其纳入设计基础条件的首选方法。该研究的目的是确定双环压水反应堆中所有给水完全损失(TLOFW)的堆芯暴露前的可用时间和所需的DEC安全特性。使用RELAP5/MOD3.3计算机代码进行计算。TLOFW的启动事件是除主给水丢失外,辅助给水也丢失的多重故障。分别对无DEC安全特性和假定具有DEC安全特性两种情况进行了仿真。结果表明,在TLOFW事件发生后,尽快跳闸是非常重要的。在失去场外动力的情况下,反应堆冷却剂泵停止,反应堆在低反应堆冷却剂泵流量下很快跳闸。在假设正常运行系统的情况下,反应堆跳闸发生在低-低蒸汽发生器窄电平,事故发生后几十秒,导致堆芯暴露前的可用时间更短。采用正常操作系统和DEC安全功能的TLOFW场景的结果表明,在30分钟前没有操作人员进行操作的情况下,二次侧排和进料可以防止岩心暴露。当使用一次侧排和进料时,操作人员可使用的时间更少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.30
自引率
0.00%
发文量
56
期刊介绍: The Journal of Nuclear Engineering and Radiation Science is ASME’s latest title within the energy sector. The publication is for specialists in the nuclear/power engineering areas of industry, academia, and government.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信