Performance Evaluation Of Floating Solar Power Plant In Sidobandung Bojonegoro

M. Rahmat, J. E. Poetro, A. S. Setiyoko, H. A. Widodo, P. Asri, Edy Prasetya Hidayat
{"title":"Performance Evaluation Of Floating Solar Power Plant In Sidobandung Bojonegoro","authors":"M. Rahmat, J. E. Poetro, A. S. Setiyoko, H. A. Widodo, P. Asri, Edy Prasetya Hidayat","doi":"10.29138/scj.v6i2.2197","DOIUrl":null,"url":null,"abstract":"Sidobandung Village is a village that will develop the potential of the village as a tourism village.The Solar Power Generation System is a power generation equipment. One of the potentials that has been successfully built is a reservoir or in local terms it is called a reservoir. With the construction of the reservoir in this village, tourism activities began to be seen. The number of visitors who came succeeded in increasing the village's income. Currently only open for daytime conditions. In its development, there is a desire to open services at night. The problem is how to reduce electricity costs. One of the facilities to support this is a floating building for the generation of floating PLTS which was built in collaboration with one of the expert vocational colleges in the field of floating buildings located in Surabaya. This Floating PLTS is a new renewable energy source, in accordance with the village's wish to become an educational tourism village. This floating PLTS is expected to be able to supply 30 lamps each having a power of 50 watts for street lighting around the reservoir. Another bean is colorful lights along the edge of the pond to give a beautiful impression of the view of the pond. The total lamp load is about 100 watts. The PLTS system that was built consists of 10 solar cell panels, each solar cell panel has a capacity of 330 WP. With a total of 4 batteries with specifications 12 Volt 200 Ah. This system is being evaluated. The evaluation results show that the battery capacity is only able to supply 15 lamps for 12 hours. So to supply all the desired load requirements, a total of 12 batteries are needed.","PeriodicalId":32386,"journal":{"name":"The Spirit of Society Journal International Journal of Society Development and Engagement","volume":"21 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Spirit of Society Journal International Journal of Society Development and Engagement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/scj.v6i2.2197","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Sidobandung Village is a village that will develop the potential of the village as a tourism village.The Solar Power Generation System is a power generation equipment. One of the potentials that has been successfully built is a reservoir or in local terms it is called a reservoir. With the construction of the reservoir in this village, tourism activities began to be seen. The number of visitors who came succeeded in increasing the village's income. Currently only open for daytime conditions. In its development, there is a desire to open services at night. The problem is how to reduce electricity costs. One of the facilities to support this is a floating building for the generation of floating PLTS which was built in collaboration with one of the expert vocational colleges in the field of floating buildings located in Surabaya. This Floating PLTS is a new renewable energy source, in accordance with the village's wish to become an educational tourism village. This floating PLTS is expected to be able to supply 30 lamps each having a power of 50 watts for street lighting around the reservoir. Another bean is colorful lights along the edge of the pond to give a beautiful impression of the view of the pond. The total lamp load is about 100 watts. The PLTS system that was built consists of 10 solar cell panels, each solar cell panel has a capacity of 330 WP. With a total of 4 batteries with specifications 12 Volt 200 Ah. This system is being evaluated. The evaluation results show that the battery capacity is only able to supply 15 lamps for 12 hours. So to supply all the desired load requirements, a total of 12 batteries are needed.
西都万隆Bojonegoro浮式太阳能电站性能评价
四斗万隆村是一个将开发旅游村潜力的村庄。太阳能发电系统是一种发电设备。其中一个已经成功建造的潜力是一个水库,或者在当地称为水库。随着该村水库的建设,旅游活动开始出现。来的游客数量成功地增加了村子的收入。目前只在白天开放。在其发展过程中,人们希望在夜间开放服务。问题是如何降低电费。支持这一目标的设施之一是与位于泗水的浮动建筑领域的一所专业职业学院合作建造的浮动建筑,用于生产浮动PLTS。这个浮动PLTS是一种新的可再生能源,符合该村成为教育旅游村的愿望。这个漂浮的PLTS预计能够提供30盏灯,每盏灯的功率为50瓦,用于水库周围的街道照明。另一个豆豆是沿着池塘边缘的彩色灯光,给池塘的景色一个美丽的印象。灯的总负载约为100瓦。建造的PLTS系统由10块太阳能电池板组成,每块太阳能电池板的容量为330 WP。共有4节电池,规格为12伏200安。这个系统正在评估中。评估结果表明,电池容量仅能供应15盏灯12小时。因此,为了满足所有所需的负载要求,总共需要12节电池。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信