{"title":"345–138 kV substation upgrade project","authors":"E. Crockett, James T. Kerkhoven, D. Eakins, Brian J. Smith, Carl M. Formento","doi":"10.1109/TDC.2016.7520013","DOIUrl":null,"url":null,"abstract":"A primary goal of electric utilities is to maintain reliable and stable service. Therefore utilities forecast and evaluate future power system scenarios and implement the necessary improvements to mitigate adverse impacts. The reliability and age of the existing substation in their northeastern service territory prompted Commonwealth Edison Company (ComEd) to initiate a major substation project. To support reliability and reinforcement improvements to their 138 kV system, a plan was developed to provide an additional source of power into the 138 kV system from the 345 kV system. This involved bisecting an existing 345 kV transmission line and constructing a new 345 kV to 138 kV substation. This paper summarizes engineering solutions to the many challenges involved in a complex transition from old to new facilities. The project was completed with no adverse events and met the stated project objectives.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"98 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7520013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A primary goal of electric utilities is to maintain reliable and stable service. Therefore utilities forecast and evaluate future power system scenarios and implement the necessary improvements to mitigate adverse impacts. The reliability and age of the existing substation in their northeastern service territory prompted Commonwealth Edison Company (ComEd) to initiate a major substation project. To support reliability and reinforcement improvements to their 138 kV system, a plan was developed to provide an additional source of power into the 138 kV system from the 345 kV system. This involved bisecting an existing 345 kV transmission line and constructing a new 345 kV to 138 kV substation. This paper summarizes engineering solutions to the many challenges involved in a complex transition from old to new facilities. The project was completed with no adverse events and met the stated project objectives.
345-138千伏变电站改造工程
电力公司的主要目标是保持可靠和稳定的服务。因此,公用事业公司预测和评估未来电力系统的情况,并实施必要的改进以减轻不利影响。鉴于其东北服务区域现有变电站的可靠性和使用年限,联邦爱迪生公司(ComEd)启动了一个大型变电站项目。为了支持他们的138千伏系统的可靠性和加强改进,他们制定了一项计划,从345千伏系统向138千伏系统提供额外的电源。这包括将现有的345千伏输电线路一分为二,并建造一个新的345千伏至138千伏变电站。本文总结了从旧设施到新设施的复杂过渡所涉及的许多挑战的工程解决方案。项目顺利完成,无不良事件发生,达到了既定的项目目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信