Reliability Assessment and Study the Effect of Substation Feeder Length on Failure Rate and Reliability Indices

IF 0.3 Q4 ENGINEERING, ELECTRICAL & ELECTRONIC
M. Teshome, Fsaha Mabrahtu
{"title":"Reliability Assessment and Study the Effect of Substation Feeder Length on Failure Rate and Reliability Indices","authors":"M. Teshome, Fsaha Mabrahtu","doi":"10.11648/j.epes.20200903.11","DOIUrl":null,"url":null,"abstract":"Today, utilities are trying to maximize system reliability, improve efficiency, and reduce costs by using protection system, distributed generation system, by reconfiguring the feeder, by connecting the end of feeder to other substation and so on. However, when it tries to use some techniques (reconfiguring the feeder, connecting the end of the feeder to another substation); the techniques have positive and negative impact on reliability improvement. The substation which is taken in this paper has the System Average Interruption Frequency Index (SAIFI) and System Average Interruption Duration Index (SAIDI) is 521.46 interruptions per customer per year and 446.82 hours per customer per year respectively. The historical outage interruption data of the years of 2016-2018 has been used as a base year. The study has evaluated the new substation to improve the system reliability. The simulation results have been done with the help of Electrical Transient Analysis Program (ETAP 12.6) software. In this paper includes improvement of the system reliability of the feeder is supplied from two substations or new substation should be connected at the end of the feeder. Due to the new substation, the length of the feeder will vary, and the variation of the feeder has significant effect on power reliability. The value of SAIFI and SAIDI after the new substation connected is 169 and 96 respectively. Since the new substation has negative impact, the value of indices is not reduced more.","PeriodicalId":43153,"journal":{"name":"International Journal of Power and Energy Systems","volume":"16 1","pages":"41"},"PeriodicalIF":0.3000,"publicationDate":"2020-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Power and Energy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/j.epes.20200903.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

Today, utilities are trying to maximize system reliability, improve efficiency, and reduce costs by using protection system, distributed generation system, by reconfiguring the feeder, by connecting the end of feeder to other substation and so on. However, when it tries to use some techniques (reconfiguring the feeder, connecting the end of the feeder to another substation); the techniques have positive and negative impact on reliability improvement. The substation which is taken in this paper has the System Average Interruption Frequency Index (SAIFI) and System Average Interruption Duration Index (SAIDI) is 521.46 interruptions per customer per year and 446.82 hours per customer per year respectively. The historical outage interruption data of the years of 2016-2018 has been used as a base year. The study has evaluated the new substation to improve the system reliability. The simulation results have been done with the help of Electrical Transient Analysis Program (ETAP 12.6) software. In this paper includes improvement of the system reliability of the feeder is supplied from two substations or new substation should be connected at the end of the feeder. Due to the new substation, the length of the feeder will vary, and the variation of the feeder has significant effect on power reliability. The value of SAIFI and SAIDI after the new substation connected is 169 and 96 respectively. Since the new substation has negative impact, the value of indices is not reduced more.
可靠性评估及变电站馈线长度对故障率和可靠性指标的影响研究
今天,公用事业公司正试图最大限度地提高系统可靠性,提高效率,并通过使用保护系统,分布式发电系统,通过重新配置馈线,通过将馈线末端连接到其他变电站等方式降低成本。然而,当它试图使用一些技术(重新配置馈线,将馈线的末端连接到另一个变电站);这些技术对可靠性的提高既有积极的影响,也有消极的影响。本文所采用的变电站系统平均中断频率指数(SAIFI)和系统平均中断持续时间指数(SAIDI)分别为521.46次/客户/年和446.82小时/客户/年。以2016-2018年的历史停电中断数据为基准年。为提高系统可靠性,对新建变电站进行了评估。利用电瞬变分析软件(ETAP 12.6)进行了仿真计算。本文包括了馈线由两个变电站供电或在馈线末端应连接新变电站时系统可靠性的提高。由于新建变电站,馈线长度会发生变化,馈线长度的变化对供电可靠性有重要影响。新变电站并网后SAIFI值为169,SAIDI值为96。由于新建变电站有负面影响,各项指标的数值没有进一步降低。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Journal of Power and Energy Systems
International Journal of Power and Energy Systems ENGINEERING, ELECTRICAL & ELECTRONIC-
CiteScore
1.00
自引率
0.00%
发文量
5
期刊介绍: First published in 1972, this journal serves a worldwide readership of power and energy professionals. As one of the premier referred publications in the field, this journal strives to be the first to explore emerging energy issues, featuring only papers of the highest scientific merit. The subject areas of this journal include power transmission, distribution and generation, electric power quality, education, energy development, competition and regulation, power electronics, communication, electric machinery, power engineering systems, protection, reliability and security, energy management systems and supervisory control, economics, dispatching and scheduling, energy systems modelling and simulation, alternative energy sources, policy and planning.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信