Carlos Seminario-Mestanza, Andrea Soto-Araujo, Martin Collao-Diaz, J. Quiroz-Flores, A. Flores-Perez
{"title":"Production Model Based on Total Productive Maintenance and Systematic Layout Planning to Increase Productivity in the Metalworking Industry","authors":"Carlos Seminario-Mestanza, Andrea Soto-Araujo, Martin Collao-Diaz, J. Quiroz-Flores, A. Flores-Perez","doi":"10.18178/joebm.2023.11.2.741","DOIUrl":null,"url":null,"abstract":"—The metalworking industry represents one of the most critical factors for the economic development of each country. However, one of its significant bottlenecks is prioritizing some orders over others and the late Maintenance of machinery, which generates stoppages in production lines and delays in processes, which translates into decreased plant productivity. Therefore, to solve these problems, this article proposes a production model based on Total Productive Maintenance and Systematic Layout Planning, which focuses on machinery and human resources to increase the Productivity of companies in this sector. The model simulation was carried out using the Arena software, where a 7.69% improvement in Productivity was obtained and a reduction of up to 32 days in the cycle time. This improvement proposal allows companies in the sector to be more competitive and provides the necessary tools to optimize their processes.","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.18178/joebm.2023.11.2.741","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 4
Abstract
—The metalworking industry represents one of the most critical factors for the economic development of each country. However, one of its significant bottlenecks is prioritizing some orders over others and the late Maintenance of machinery, which generates stoppages in production lines and delays in processes, which translates into decreased plant productivity. Therefore, to solve these problems, this article proposes a production model based on Total Productive Maintenance and Systematic Layout Planning, which focuses on machinery and human resources to increase the Productivity of companies in this sector. The model simulation was carried out using the Arena software, where a 7.69% improvement in Productivity was obtained and a reduction of up to 32 days in the cycle time. This improvement proposal allows companies in the sector to be more competitive and provides the necessary tools to optimize their processes.
金属加工业是每个国家经济发展最关键的因素之一。然而,它的一个重要瓶颈是优先考虑一些订单而不是其他订单,以及机器的延迟维护,这导致生产线停工和流程延误,从而导致工厂生产率下降。因此,为了解决这些问题,本文提出了一种基于Total production Maintenance and Systematic Layout Planning的生产模型,以机械和人力资源为重点,提高该行业企业的生产率。使用Arena软件进行模型模拟,生产率提高了7.69%,周期时间缩短了32天。这一改进建议使该行业的公司更具竞争力,并为优化其流程提供了必要的工具。