Challenges Facing Local Contractors Working with Chinese Contractors in Addis Ababa Building Projects

Solomon Esaiyas, G. Kahssay
{"title":"Challenges Facing Local Contractors Working with Chinese Contractors in Addis Ababa Building Projects","authors":"Solomon Esaiyas, G. Kahssay","doi":"10.11648/J.AJCE.20200804.12","DOIUrl":null,"url":null,"abstract":"Building construction projects particularly represents one of the largest sectors of the construction industry. Currently, the rise in construction of high rising buildings are observed in Addis Ababa, the capital city of Ethiopia. The number and size of building construction projects that are being constructed in the city are increasing through time and most of these projects were being carried out by Chinese contractors. Local contractors are also involved in those projects via a subcontracting strategy. However, it is not easy for local contractors to succeed by working with their foreign counterparts who have massive international experience and capacity. The aim of this study was assessing and identifying the challenging factors affecting local contractors’ performance in Chinese building projects in Addis Ababa. In order to achieve the objectives of this study, both quantitative and qualitative research approach were used with primary and secondary source of data. This study employed three types of data collection techniques such as a questionnaire surveys, interviews and observations. The target population for this study are local contractors and consultants involved in building projects that are carried out by Chinese contractors. In this study the researcher used Census/Parametric method of survey. That mean all target population of this study are included in this investigation, based on the consent and willingness of the participants. The Relative Importance Index (RII) was used as an instrument for analyzing data collected through questionnaire in tabular form by using Likert’s scale of five ordinal measures. Based on the analysis, it was found that the most challenging factors affecting local contractors’ performance in Chinese building projects were financial constraints, information exchange problems, cultural differences, unfamiliarity with Chinese work methodology and project complexity with a RII value of 0.84, 0.81, 0.77, 0.73 and 0.71 respectively. This study also identified and discussed the major cause and impact of those challenges and proposed measures to minimize their effect on the local performance in the upcoming projects through interviews from respondents and analyzed by using content analysis.","PeriodicalId":7606,"journal":{"name":"American Journal of Civil Engineering","volume":"9 1","pages":"87"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"American Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/J.AJCE.20200804.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Building construction projects particularly represents one of the largest sectors of the construction industry. Currently, the rise in construction of high rising buildings are observed in Addis Ababa, the capital city of Ethiopia. The number and size of building construction projects that are being constructed in the city are increasing through time and most of these projects were being carried out by Chinese contractors. Local contractors are also involved in those projects via a subcontracting strategy. However, it is not easy for local contractors to succeed by working with their foreign counterparts who have massive international experience and capacity. The aim of this study was assessing and identifying the challenging factors affecting local contractors’ performance in Chinese building projects in Addis Ababa. In order to achieve the objectives of this study, both quantitative and qualitative research approach were used with primary and secondary source of data. This study employed three types of data collection techniques such as a questionnaire surveys, interviews and observations. The target population for this study are local contractors and consultants involved in building projects that are carried out by Chinese contractors. In this study the researcher used Census/Parametric method of survey. That mean all target population of this study are included in this investigation, based on the consent and willingness of the participants. The Relative Importance Index (RII) was used as an instrument for analyzing data collected through questionnaire in tabular form by using Likert’s scale of five ordinal measures. Based on the analysis, it was found that the most challenging factors affecting local contractors’ performance in Chinese building projects were financial constraints, information exchange problems, cultural differences, unfamiliarity with Chinese work methodology and project complexity with a RII value of 0.84, 0.81, 0.77, 0.73 and 0.71 respectively. This study also identified and discussed the major cause and impact of those challenges and proposed measures to minimize their effect on the local performance in the upcoming projects through interviews from respondents and analyzed by using content analysis.
在亚的斯亚贝巴建筑项目中,当地承包商与中国承包商合作面临的挑战
建筑项目是建筑业中最大的一个部门。目前,在埃塞俄比亚首都亚的斯亚贝巴,高层建筑的建设正在兴起。随着时间的推移,这座城市正在建设的建筑工程的数量和规模都在增加,其中大部分工程都是由中国承包商进行的。当地承包商也通过分包战略参与这些项目。然而,要想与拥有丰富国际经验和能力的外国同行合作,本土承包商并不容易取得成功。本研究的目的是评估和确定影响亚的斯亚贝巴中国建筑项目当地承包商绩效的挑战性因素。为了达到本研究的目的,采用了定量和定性的研究方法,主要和次要的数据来源。本研究采用问卷调查、访谈和观察三种数据收集技术。本研究的目标人群是参与由中国承包商进行的建筑项目的当地承包商和顾问。本研究采用普查/参数法进行调查。这意味着在参与者同意和意愿的基础上,本次研究的所有目标人群都被纳入本次调查。相对重要性指数(Relative Importance Index, RII)作为工具,采用李克特五序数量表,以表格形式对问卷收集的数据进行分析。分析发现,在中国建筑项目中,影响当地承包商绩效的最具挑战性的因素是资金约束、信息交流问题、文化差异、不熟悉中国的工作方法和项目复杂性,其RII值分别为0.84、0.81、0.77、0.73和0.71。本研究还确定并讨论了这些挑战的主要原因和影响,并提出了措施,以尽量减少他们对即将到来的项目的本地性能的影响,通过受访者的访谈,并通过使用内容分析进行分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信