Using the Critical Path Method to Find Time of Constriction for Helicopters Airport Project in the Oil Fields

IF 0.3 Q4 ECONOMICS
Karrar Abbas Johi Salah, Wakas Saad Khalaf
{"title":"Using the Critical Path Method to Find Time of Constriction for Helicopters Airport Project in the Oil Fields","authors":"Karrar Abbas Johi Salah, Wakas Saad Khalaf","doi":"10.33095/jeas.v29i135.2501","DOIUrl":null,"url":null,"abstract":"This research is considered one of the important researches in Maysan Governorate, as it focuses on the construction of helicopter airport project in the oil fields of the Maysan Oil Company, where the oil general companies in Maysan Governorate suffer from the cost of transporting the foreign engineering experts and the governing equipment of sustaining oil industry from Iraq's international airports to oil fields and vice versa. Private international transport companies transport foreign engineering from the oil fields to Iraqi airports and vice versa, and other international security companies take action to provide protection for foreign engineering experts during transportation. Hence, this process is very costly. \n     The objective of this research is to construct helicopters airport in the oil fields of the Maysan Oil Company, which can be reduced the required time for the arrival of foreign engineering experts and required equipment to the oil fields of the company by using the Critical Path Method (CPM). This may assist finding the time and cost of completing the project and drawing charts the project in light of the existence of non-traditional relationships between some activities in the project network, depending on the computer engineering software such as Primavera V6. 478 days were required to complete the project. Finally, a number of conclusions and recommendations are drawn up, and a number of future studies are suggested. \nPaper type: Research Paper","PeriodicalId":53940,"journal":{"name":"Eskisehir Osmangazi Universitesi IIBF Dergisi-Eskisehir Osmangazi University Journal of Economics and Administrative Sciences","volume":"21 1","pages":""},"PeriodicalIF":0.3000,"publicationDate":"2023-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eskisehir Osmangazi Universitesi IIBF Dergisi-Eskisehir Osmangazi University Journal of Economics and Administrative Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33095/jeas.v29i135.2501","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 0

Abstract

This research is considered one of the important researches in Maysan Governorate, as it focuses on the construction of helicopter airport project in the oil fields of the Maysan Oil Company, where the oil general companies in Maysan Governorate suffer from the cost of transporting the foreign engineering experts and the governing equipment of sustaining oil industry from Iraq's international airports to oil fields and vice versa. Private international transport companies transport foreign engineering from the oil fields to Iraqi airports and vice versa, and other international security companies take action to provide protection for foreign engineering experts during transportation. Hence, this process is very costly.      The objective of this research is to construct helicopters airport in the oil fields of the Maysan Oil Company, which can be reduced the required time for the arrival of foreign engineering experts and required equipment to the oil fields of the company by using the Critical Path Method (CPM). This may assist finding the time and cost of completing the project and drawing charts the project in light of the existence of non-traditional relationships between some activities in the project network, depending on the computer engineering software such as Primavera V6. 478 days were required to complete the project. Finally, a number of conclusions and recommendations are drawn up, and a number of future studies are suggested. Paper type: Research Paper
用关键路径法求油田直升机机场工程收缩时间
本研究是Maysan省的重要研究之一,因为它关注的是Maysan石油公司油田直升机机场项目的建设,而Maysan省的石油总公司要承担从伊拉克国际机场向油田运送外国工程专家和维持石油工业的控制设备的费用。私营国际运输公司将外国工程从油田运送到伊拉克机场,反之亦然,其他国际保安公司在运输过程中为外国工程专家提供保护。因此,这个过程是非常昂贵的。本研究的目的是在美山石油公司油田建设直升机机场,利用关键路径法(Critical Path Method, CPM)缩短国外工程专家和所需设备到达美山石油公司油田所需的时间。这可能有助于找到完成项目的时间和成本,并根据项目网络中某些活动之间存在的非传统关系绘制项目图表,这取决于计算机工程软件,如Primavera V6。完成该项目需要478天。最后,提出了一些结论和建议,并提出了一些未来的研究建议。论文类型:研究论文
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
20.00%
发文量
15
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信