Gas Valorization in the Republic of Congo: Production of Electricity from National Gas Reserves

Prince Valdano Itoua, Durell Esperance Ndinga Manguet
{"title":"Gas Valorization in the Republic of Congo: Production of Electricity from National Gas Reserves","authors":"Prince Valdano Itoua, Durell Esperance Ndinga Manguet","doi":"10.4236/NR.2021.125012","DOIUrl":null,"url":null,"abstract":"The environmental impact of greenhouse gases based on natural gas flaring influences the rate of gas recovery around the world. In the Republic of Congo, the natural gas reserve in 2019 is estimated at 90 billion cubic meters (BCM). In this study, from the Congolese gas reserve we used five gas turbines with a capacity of 150 MW each; these five turbines consume 1.69 billion cubic meters (BCM)/year for the power of 273.750 MW and consumption of 6.57 billion kilowatt-hours. The results of this study revealed that an investment capital of 192,305,137 euros was required with a net profit of 9,581,250 euros at an annual rate of return of 4.98% with an investment payback period of approximately 20 years. This will allow the Congolese government to accomplish its policy of valuing gas and developing the country; the electricity produced by the National Petroleum Company of Congo (SNPC) will be sold to the Electrical Energy of Congo (E2C) at 0.06 euro/kWh.","PeriodicalId":19086,"journal":{"name":"Natural Resources","volume":"31 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Natural Resources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/NR.2021.125012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The environmental impact of greenhouse gases based on natural gas flaring influences the rate of gas recovery around the world. In the Republic of Congo, the natural gas reserve in 2019 is estimated at 90 billion cubic meters (BCM). In this study, from the Congolese gas reserve we used five gas turbines with a capacity of 150 MW each; these five turbines consume 1.69 billion cubic meters (BCM)/year for the power of 273.750 MW and consumption of 6.57 billion kilowatt-hours. The results of this study revealed that an investment capital of 192,305,137 euros was required with a net profit of 9,581,250 euros at an annual rate of return of 4.98% with an investment payback period of approximately 20 years. This will allow the Congolese government to accomplish its policy of valuing gas and developing the country; the electricity produced by the National Petroleum Company of Congo (SNPC) will be sold to the Electrical Energy of Congo (E2C) at 0.06 euro/kWh.
刚果共和国的天然气增值:利用国家天然气储备发电
天然气燃烧产生的温室气体对环境的影响影响着世界各地的天然气采收率。在刚果共和国,2019年的天然气储量估计为900亿立方米。在这项研究中,我们从刚果的天然气储备中使用了五台容量为150兆瓦的燃气轮机;这5台水轮机年耗电量为16.9亿立方米,功率为273.750兆瓦,耗电量为65.7亿千瓦时。本研究结果显示,需要投资资本192,305,137欧元,净利润9,581,250欧元,年回报率为4.98%,投资回收期约为20年。这将使刚果政府能够实现其重视天然气和发展国家的政策;刚果国家石油公司(SNPC)生产的电力将以0.06欧元/千瓦时的价格出售给刚果电力公司(E2C)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信