Analisis Kebutuhan Air Irigasi Di Desa Pagar Banyu Kecamatan Pagar Alam Utara

Elpita Aisah
{"title":"Analisis Kebutuhan Air Irigasi Di Desa Pagar Banyu Kecamatan Pagar Alam Utara","authors":"Elpita Aisah","doi":"10.36050/berings.v6i01.148","DOIUrl":null,"url":null,"abstract":"The overall need for irrigation water needs to be known as it is one of the important stages required in the planning and management of irrigation systems. Based on this, the purpose of this research is to analyze the irrigation water requirement in the study area of ​​Irrigation Area of ​​Pagar Banyu Village, Pagar Alam Utara Subdistrict, for Irrigation Area of ​​Pagar Banyu Village with an area of ​​26 ha, the source of water comes from Pagar Banyu water siring. Factors for determining irrigation water requirements include land preparation, consumptive use, percolation and seepage, effective change of water layer and rainfall. The calculation is done manually with the concept of KP-01. The need for irrigation water starts from the beginning of November using the rice-rice-palawija cropping pattern. From the total calculation, the irrigation water demand is 1.02 m3 / dt, while the available water discharge in Pagar Banyu is 1.37m3 / st, thus it can be concluded that the available water can meet the irrigation water needs in the irrigation area of ​​Pagar banyu Village Kecamtan Northern nature fence.","PeriodicalId":17796,"journal":{"name":"JURNAL ILMIAH BERING'S","volume":"11 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL ILMIAH BERING'S","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36050/berings.v6i01.148","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The overall need for irrigation water needs to be known as it is one of the important stages required in the planning and management of irrigation systems. Based on this, the purpose of this research is to analyze the irrigation water requirement in the study area of ​​Irrigation Area of ​​Pagar Banyu Village, Pagar Alam Utara Subdistrict, for Irrigation Area of ​​Pagar Banyu Village with an area of ​​26 ha, the source of water comes from Pagar Banyu water siring. Factors for determining irrigation water requirements include land preparation, consumptive use, percolation and seepage, effective change of water layer and rainfall. The calculation is done manually with the concept of KP-01. The need for irrigation water starts from the beginning of November using the rice-rice-palawija cropping pattern. From the total calculation, the irrigation water demand is 1.02 m3 / dt, while the available water discharge in Pagar Banyu is 1.37m3 / st, thus it can be concluded that the available water can meet the irrigation water needs in the irrigation area of ​​Pagar banyu Village Kecamtan Northern nature fence.
需要了解灌溉用水的总体需求,因为这是灌溉系统规划和管理所需的重要阶段之一。在此基础上,本研究的目的是分析巴格阿拉姆乌塔拉街道巴格巴育村灌区研究区域的灌溉用水需求,巴格巴育村灌区面积为26 ha,水源来自巴格巴育引水。决定灌溉需水量的因素包括平整土地、消耗利用、渗透和渗漏、水层的有效变化和降雨量。计算是用KP-01的概念手工完成的。灌溉用水的需求从11月初开始,采用水稻-水稻-巴拉维贾种植模式。由总计算可知,巴嘎板峪灌溉需水量为1.02 m3 / dt,有效水量为1.37m3 / st,可得出巴嘎板峪村可察滩北部自然围栏灌区有效水量可满足灌溉用水需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信