Management of independent software acceptance test in the space domain: A practitioner's view

K. Wortman
{"title":"Management of independent software acceptance test in the space domain: A practitioner's view","authors":"K. Wortman","doi":"10.1109/AERO.2012.6187423","DOIUrl":null,"url":null,"abstract":"This paper discusses management of the independent acceptance test activity in a space domain software development cycle. The goal of acceptance test is to independently verify functional software requirements to achieve a high level of confidence in the software system before release for operational use. Key management areas have been identified through internal independent acceptance test practice at Johns Hopkins University Applied Physics Laboratory for NASA's Radiation Belt Storm Probes software system. The key management areas have been categorized as People, Constraints, Needs and Quality (PCNQ). The supporting framework for management of the PCNQ factors encompasses the established lines and means of communications for the project, and the organizational culture. The PCNQ areas and their relationships must be strategically managed within the framework for an effective independent acceptance test of a spacecraft's mission software system. The concepts presented in this paper will promote understanding of the management role of an independent software acceptance test activity in the space domain.","PeriodicalId":6421,"journal":{"name":"2012 IEEE Aerospace Conference","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2012-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE Aerospace Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AERO.2012.6187423","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper discusses management of the independent acceptance test activity in a space domain software development cycle. The goal of acceptance test is to independently verify functional software requirements to achieve a high level of confidence in the software system before release for operational use. Key management areas have been identified through internal independent acceptance test practice at Johns Hopkins University Applied Physics Laboratory for NASA's Radiation Belt Storm Probes software system. The key management areas have been categorized as People, Constraints, Needs and Quality (PCNQ). The supporting framework for management of the PCNQ factors encompasses the established lines and means of communications for the project, and the organizational culture. The PCNQ areas and their relationships must be strategically managed within the framework for an effective independent acceptance test of a spacecraft's mission software system. The concepts presented in this paper will promote understanding of the management role of an independent software acceptance test activity in the space domain.
空间域中独立软件验收测试的管理:一个实践者的观点
本文讨论了空间域软件开发周期中独立验收测试活动的管理。验收测试的目标是独立地验证功能性软件需求,以在软件系统发布用于操作使用之前获得高水平的信心。通过约翰霍普金斯大学应用物理实验室对NASA辐射带风暴探测器软件系统的内部独立验收测试实践,确定了关键管理领域。关键管理领域分为人员、约束、需求和质量(PCNQ)。PCNQ因素管理的支持框架包括为项目建立的沟通渠道和手段,以及组织文化。PCNQ区域及其关系必须在航天器任务软件系统有效独立验收测试的框架内进行战略管理。本文中提出的概念将促进对空间域中独立软件验收测试活动的管理角色的理解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信