Construction and measurement techniques for the APS LEUTL project RF beam position monitors

A. Gorski, R. Lill
{"title":"Construction and measurement techniques for the APS LEUTL project RF beam position monitors","authors":"A. Gorski, R. Lill","doi":"10.1109/PAC.1999.795565","DOIUrl":null,"url":null,"abstract":"The design, construction, and assembly procedure of 24 RF beam position monitors used in the Advanced Photon Source low-energy undulator test line and linear accelerator (linac) are described. Beam stability as well as beam positioning capabilities are essential to the LEUTL project. A design objective of the LEUTL facility is to achieve better than 1-/spl mu/m resolution. The highest care was used in the mechanical fabrication and assembly of the BPM units. The latest experimental results using these BPMs are presented.","PeriodicalId":20453,"journal":{"name":"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1999-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1999.795565","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

The design, construction, and assembly procedure of 24 RF beam position monitors used in the Advanced Photon Source low-energy undulator test line and linear accelerator (linac) are described. Beam stability as well as beam positioning capabilities are essential to the LEUTL project. A design objective of the LEUTL facility is to achieve better than 1-/spl mu/m resolution. The highest care was used in the mechanical fabrication and assembly of the BPM units. The latest experimental results using these BPMs are presented.
APS LEUTL项目射频波束位置监测仪的结构和测量技术
介绍了用于先进光子源低能波动器试验线和直线加速器的24台射频波束位置监测器的设计、构造和装配过程。波束稳定性和波束定位能力对LEUTL项目至关重要。LEUTL设备的设计目标是实现优于1-/spl mu/m的分辨率。在BPM单元的机械制造和组装中使用了最高的护理。介绍了这些bpm的最新实验结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信