Identifying the Causes of Delay in the Building Sector in Egypt: A Case Study of Small and Medium-Sized Companies

Wahbi Albasyouni, Abdallah Elbassal
{"title":"Identifying the Causes of Delay in the Building Sector in Egypt: A Case Study of Small and Medium-Sized Companies","authors":"Wahbi Albasyouni, Abdallah Elbassal","doi":"10.54327/set2023/v3.i1.55","DOIUrl":null,"url":null,"abstract":"      Delay in the construction industry is known to be a significant issue as indicated by many studies in the past few years. The construction sector in Egypt is not an exception as a wide range of projects are suffering from time overrun. the presence of time overrun in the project is the root of other problems such as cost overrun and poor quality. Hence, one of the simplest ways of dealing with delays is by identifying the causes and sources of delays in construction projects in Egypt. Therefore, this paper discussed the causes of delay in the building sector in Egypt according to the perspective of professional parties working in different small and medium-sized companies. The main method of data collection was a questionnaire survey with small and medium-sized companies in Egypt. The participants had more than 5 years of experience in the Egyptian construction sector. The financial problems faced by owners were considered significant by two different companies which indicates that this factor is usually the reason for delays in projects in Egypt. Ineffective planning and scheduling have also proven to be important in the procedure of preventing delays as it was mentioned by all experts involved in the data collection. This study has shown that the perspective of experts working in different companies may not be the same regarding the causes of delays in the construction sector. The adequate understanding of the causes aids in proposing effective strategies that can reduce the occurrence and impact of delays.","PeriodicalId":88410,"journal":{"name":"Bubble science engineering and technology","volume":"37 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-04-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bubble science engineering and technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54327/set2023/v3.i1.55","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

      Delay in the construction industry is known to be a significant issue as indicated by many studies in the past few years. The construction sector in Egypt is not an exception as a wide range of projects are suffering from time overrun. the presence of time overrun in the project is the root of other problems such as cost overrun and poor quality. Hence, one of the simplest ways of dealing with delays is by identifying the causes and sources of delays in construction projects in Egypt. Therefore, this paper discussed the causes of delay in the building sector in Egypt according to the perspective of professional parties working in different small and medium-sized companies. The main method of data collection was a questionnaire survey with small and medium-sized companies in Egypt. The participants had more than 5 years of experience in the Egyptian construction sector. The financial problems faced by owners were considered significant by two different companies which indicates that this factor is usually the reason for delays in projects in Egypt. Ineffective planning and scheduling have also proven to be important in the procedure of preventing delays as it was mentioned by all experts involved in the data collection. This study has shown that the perspective of experts working in different companies may not be the same regarding the causes of delays in the construction sector. The adequate understanding of the causes aids in proposing effective strategies that can reduce the occurrence and impact of delays.
确定埃及建筑业延迟的原因:以中小型公司为例
正如过去几年的许多研究表明的那样,建筑业的延误是一个重大问题。埃及的建筑部门也不例外,因为各种各样的项目都面临着时间超限的问题。项目中时间超支的存在是其他问题的根源,如成本超支和质量差。因此,处理延误的最简单方法之一是确定埃及建设项目延误的原因和来源。因此,本文根据在不同中小型公司工作的专业方的角度讨论了埃及建筑部门延迟的原因。数据收集的主要方法是对埃及中小企业进行问卷调查。参与者在埃及建筑行业有超过5年的经验。两家不同的公司认为业主面临的财务问题很严重,这表明这一因素通常是埃及项目延误的原因。正如参与数据收集的所有专家所提到的那样,无效的规划和调度也证明是防止延误程序的重要因素。这项研究表明,在不同公司工作的专家对建筑部门延误的原因的看法可能不一样。充分了解原因有助于提出有效的战略,减少延误的发生和影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信