The Choice of Nuclear Energy for Ghana as a Result of Development of Its Energy Production

K. Gyamfi, S. Birikorang, E. Ampomah-Amoako, J. Fletcher, Bernard Osei
{"title":"The Choice of Nuclear Energy for Ghana as a Result of Development of Its Energy Production","authors":"K. Gyamfi, S. Birikorang, E. Ampomah-Amoako, J. Fletcher, Bernard Osei","doi":"10.1155/2020/8823720","DOIUrl":null,"url":null,"abstract":"Ghana thought of nuclear energy early in the 1960s but has not been able to realize this dream of generating electricity from nuclear power. Ghana’s electricity generation dates back to the Gold Coast era where the main source of electricity supply (isolated diesel generators) was owned by industrial establishments, municipalities, and other institutions. The electricity sector has developed over the years and has diversified its power generation development to take advantage of available and sustainable sources of energy, mainly hydro, natural gas, liquefied petroleum products, and renewables. These sources sought to increase the electricity production capacity in the country, but unfortunately, it has not been able to catch up with the rate of economic growth, urbanization, industrialization, and rural electrification projects. This has led to Ghana’s persistent energy crisis, with inadequate and unpredictable power supply coupled with erratic and prolonged cuts of electricity to homes, industries, and businesses which is now colloquially referred to in the local parlance as “dumsor.” The Government of Ghana and key stakeholders have therefore decided to add nuclear energy to the energy mix of the country to complement the country’s two main energy sources being hydro and thermal electricity. The details of the developments in the electricity sector leading to the choice of nuclear energy as the best solution for Ghana have been outlined.","PeriodicalId":30572,"journal":{"name":"Journal of Energy","volume":"48 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1155/2020/8823720","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Ghana thought of nuclear energy early in the 1960s but has not been able to realize this dream of generating electricity from nuclear power. Ghana’s electricity generation dates back to the Gold Coast era where the main source of electricity supply (isolated diesel generators) was owned by industrial establishments, municipalities, and other institutions. The electricity sector has developed over the years and has diversified its power generation development to take advantage of available and sustainable sources of energy, mainly hydro, natural gas, liquefied petroleum products, and renewables. These sources sought to increase the electricity production capacity in the country, but unfortunately, it has not been able to catch up with the rate of economic growth, urbanization, industrialization, and rural electrification projects. This has led to Ghana’s persistent energy crisis, with inadequate and unpredictable power supply coupled with erratic and prolonged cuts of electricity to homes, industries, and businesses which is now colloquially referred to in the local parlance as “dumsor.” The Government of Ghana and key stakeholders have therefore decided to add nuclear energy to the energy mix of the country to complement the country’s two main energy sources being hydro and thermal electricity. The details of the developments in the electricity sector leading to the choice of nuclear energy as the best solution for Ghana have been outlined.
加纳能源生产发展对核能的选择
加纳早在20世纪60年代就想到了核能,但一直未能实现利用核能发电的梦想。加纳的发电可以追溯到黄金海岸时代,当时电力供应的主要来源(孤立的柴油发电机)由工业企业、市政当局和其他机构所有。电力部门经过多年的发展,已经实现了发电发展的多元化,以利用现有和可持续的能源,主要是水力、天然气、液化石油产品和可再生能源。这些资源试图增加该国的电力生产能力,但不幸的是,它未能赶上经济增长,城市化,工业化和农村电气化项目的速度。这导致了加纳持续的能源危机,电力供应不足且不可预测,加上家庭、工业和企业的电力供应不稳定且长期中断,这在当地的说法中被称为“dumsor”。因此,加纳政府和主要利益攸关方决定将核能纳入该国的能源结构,以补充该国两大主要能源——水电和火电。已经概述了导致选择核能作为加纳最佳解决方案的电力部门发展的细节。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
13
审稿时长
28 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信