{"title":"study on reduction of cost overrun and time delay in building construction using six sigma","authors":"nbspsheik farid.a","doi":"10.1729/JOURNAL.27602","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":14009,"journal":{"name":"International Journal of Mechanical and Production Engineering Research and Development","volume":"116 1","pages":"38-45"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mechanical and Production Engineering Research and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1729/JOURNAL.27602","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}