{"title":"Numerical Assessment of Water Quality Using Quality Control - A Case Study of Idah, Kogi State, Nigeria","authors":"Wilson Simon Barguma, O. Achimugu","doi":"10.9734/ajpas/2023/v24i2521","DOIUrl":null,"url":null,"abstract":"This research seeks to apply \"numerical assessment of water quality using quality control - A case study of Idah, Kogi state, Nigeria.” Secondary data of 500 bags of Idah factory water produced over period of 23 days were analyzed using control chart for fraction and number defectives to monitor the proportions of defective and number of defects in the factory water. It was found using P-CHART that central line (CL), upper control limit (UCL) and lower control limit (LCL) were 0.04, 0.07, and 0.01 respectively. Similarly, the result obtained using NP-CHART in monitoring number of defects in Idah factory water production indicated that , lower control limit (LCL), central line  and  upper control limit (UCL) were 8, 22 and 36 respectively. In both cases all the points were within the control limits. This implies that the production process is in a state of statistical control. It was therefore, recommended that the current components of the production process should be sustained among other things.","PeriodicalId":8532,"journal":{"name":"Asian Journal of Probability and Statistics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asian Journal of Probability and Statistics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9734/ajpas/2023/v24i2521","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This research seeks to apply "numerical assessment of water quality using quality control - A case study of Idah, Kogi state, Nigeria.” Secondary data of 500 bags of Idah factory water produced over period of 23 days were analyzed using control chart for fraction and number defectives to monitor the proportions of defective and number of defects in the factory water. It was found using P-CHART that central line (CL), upper control limit (UCL) and lower control limit (LCL) were 0.04, 0.07, and 0.01 respectively. Similarly, the result obtained using NP-CHART in monitoring number of defects in Idah factory water production indicated that , lower control limit (LCL), central line  and  upper control limit (UCL) were 8, 22 and 36 respectively. In both cases all the points were within the control limits. This implies that the production process is in a state of statistical control. It was therefore, recommended that the current components of the production process should be sustained among other things.
利用质量控制对水质进行数值评估——以尼日利亚科吉州伊达为例
这项研究寻求应用“利用质量控制对水质进行数值评估——以尼日利亚科吉州伊达为例”。对500袋Idah厂用水23天的二次数据进行分析,采用不合格品分数和不合格品数量控制图,监测厂用水不合格品比例和不合格品数量。P-CHART结果显示,中心线(CL)、上控制限(UCL)和下控制限(LCL)分别为0.04、0.07和0.01。同样,利用NP-CHART对Idah厂产水缺陷数的监测结果表明,控制下限(LCL)为8,中线(central line)为22,上限(upper control limit)为36。在这两种情况下,所有的点都在控制范围内。这意味着生产过程处于统计控制状态。因此,有人建议,除其他事项外,应维持生产过程的现有组成部分。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信