Project valuation and scheduling with recourse

F.Y. Phillips, R. K. Srivastava, R. Springer
{"title":"Project valuation and scheduling with recourse","authors":"F.Y. Phillips, R. K. Srivastava, R. Springer","doi":"10.1109/PICMET.1991.183630","DOIUrl":null,"url":null,"abstract":"A model is presented to treat new product development projects that are subject to a mid-project management review. The model solves a 'chicken and egg' problem in concurrent life cycle analysis, namely that a project cannot be costed until it is scheduled, cannot be scheduled until the continuation decision is made, and cannot be evaluated for continuation until it is costed. The model solves the conundrum via a mixed integer programming formulation that makes all three determinations simultaneously. It poses the problem as an exercise in managerial options. A worked example illustrates the technique.<<ETX>>","PeriodicalId":22349,"journal":{"name":"Technology Management : the New International Language","volume":"34 1","pages":"266-271"},"PeriodicalIF":0.0000,"publicationDate":"1991-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technology Management : the New International Language","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.1991.183630","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A model is presented to treat new product development projects that are subject to a mid-project management review. The model solves a 'chicken and egg' problem in concurrent life cycle analysis, namely that a project cannot be costed until it is scheduled, cannot be scheduled until the continuation decision is made, and cannot be evaluated for continuation until it is costed. The model solves the conundrum via a mixed integer programming formulation that makes all three determinations simultaneously. It poses the problem as an exercise in managerial options. A worked example illustrates the technique.<>
有追索权的项目评估和进度安排
提出了一个模型来处理受中期项目管理评审影响的新产品开发项目。该模型解决了并行生命周期分析中的“先有鸡还是先有蛋”问题,即只有在计划好项目后才能对其进行成本计算,只有在做出继续决策后才能对其进行计划计算,只有在对其进行成本计算后才能对其进行评估。该模型通过一个混合整数规划公式解决了这个难题,该公式同时做出了这三个决定。它把这个问题作为一种管理选择的练习。一个工作实例说明了该技术。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信