The impact of the Tropical Water Project on the operation of Darbandikhan dam

Q1 Chemical Engineering
{"title":"The impact of the Tropical Water Project on the operation of Darbandikhan dam","authors":"","doi":"10.1016/j.jksues.2022.06.003","DOIUrl":null,"url":null,"abstract":"<div><p>In addition to global warming and population growth, the Turkish and Iranian water projects have negatively affected the water resources in Iraq. Recently, Iran has implemented its largest water project (The Tropical Water Project – TWP). This project aims to store the flowing water in the Sirwan and Zmkan rivers (i.e., tributaries of the Diyala River) to provide irrigation, domestic, and industrial water for areas inside and outside the Diyala River Basin. The Darbandikhan dam and Halabja water supply project are located on the Diyala River. In this study, the impact of the TWP on the operation of the Darbandikhan dam and Halabja water supply project was investigated. The monthly inflow data of the Darbandikhan dam from September 1991 to December 2017 were used to simulate the operation of the dam using the HEC-ResSim 3.1 package. Two scenarios were adopted for the operation of the Darbandikhan dam. In the first scenario, the Darbandikhan dam operation was simulated without considering the effects of the TWP project.</p><p>In contrast, in the second scenario, the full operation of the TWP project was considered. The results revealed that about 48.4% of the power generation capacity would be lost, and the water surface elevation in the reservoir would be affected significantly due to the TWP project. The water surface elevation would be at or below 443 m for long periods, which will affect the operation of the Halabja water supply project.</p></div>","PeriodicalId":35558,"journal":{"name":"Journal of King Saud University, Engineering Sciences","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S1018363922000629/pdfft?md5=9040f0251568c3274555810dd0514b67&pid=1-s2.0-S1018363922000629-main.pdf","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of King Saud University, Engineering Sciences","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1018363922000629","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Chemical Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

In addition to global warming and population growth, the Turkish and Iranian water projects have negatively affected the water resources in Iraq. Recently, Iran has implemented its largest water project (The Tropical Water Project – TWP). This project aims to store the flowing water in the Sirwan and Zmkan rivers (i.e., tributaries of the Diyala River) to provide irrigation, domestic, and industrial water for areas inside and outside the Diyala River Basin. The Darbandikhan dam and Halabja water supply project are located on the Diyala River. In this study, the impact of the TWP on the operation of the Darbandikhan dam and Halabja water supply project was investigated. The monthly inflow data of the Darbandikhan dam from September 1991 to December 2017 were used to simulate the operation of the dam using the HEC-ResSim 3.1 package. Two scenarios were adopted for the operation of the Darbandikhan dam. In the first scenario, the Darbandikhan dam operation was simulated without considering the effects of the TWP project.

In contrast, in the second scenario, the full operation of the TWP project was considered. The results revealed that about 48.4% of the power generation capacity would be lost, and the water surface elevation in the reservoir would be affected significantly due to the TWP project. The water surface elevation would be at or below 443 m for long periods, which will affect the operation of the Halabja water supply project.

热带水项目对达尔班迪汗大坝运行的影响
除了全球变暖和人口增长之外,土耳其和伊朗的水利项目也对伊拉克的水资源产生了负面影响。最近,伊朗实施了其最大的水利项目(热带水利项目--TWP)。该项目旨在储存锡尔万河和兹姆坎河(即迪亚拉河的支流)的流水,为迪亚拉河流域内外的地区提供灌溉、生活和工业用水。达尔班迪汗大坝和哈拉布贾供水项目位于迪亚拉河上。本研究调查了 TWP 对 Darbandikhan 大坝和 Halabja 供水项目运行的影响。使用 HEC-ResSim 3.1 软件包对达尔班迪汗大坝 1991 年 9 月至 2017 年 12 月的月度流入量数据进行了模拟。达尔班迪汗大坝的运行采用了两种情景。第一种情况是在不考虑 TWP 项目影响的情况下模拟 Darbandikhan 大坝的运行。结果表明,由于 TWP 项目的实施,将损失约 48.4% 的发电能力,水库的水面高度也将受到很大影响。水面高度将长期处于或低于 443 米,这将影响哈拉布贾供水项目的运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of King Saud University, Engineering Sciences
Journal of King Saud University, Engineering Sciences Chemical Engineering-Fluid Flow and Transfer Processes
CiteScore
12.10
自引率
0.00%
发文量
87
审稿时长
63 days
期刊介绍: Journal of King Saud University - Engineering Sciences (JKSUES) is a peer-reviewed journal published quarterly. It is hosted and published by Elsevier B.V. on behalf of King Saud University. JKSUES is devoted to a wide range of sub-fields in the Engineering Sciences and JKSUES welcome articles of interdisciplinary nature.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信