Crude Oil Storage Tank Refurbishment Duration Optimized by 40% Through Advanced Techniques

S. M. Al Yammahi, Mohamed Obaid Al Kaabi, Rashid Al Zaabi, Sachin A. Shendge, Manly Vista Dizon, Ananda Sarkar
{"title":"Crude Oil Storage Tank Refurbishment Duration Optimized by 40% Through Advanced Techniques","authors":"S. M. Al Yammahi, Mohamed Obaid Al Kaabi, Rashid Al Zaabi, Sachin A. Shendge, Manly Vista Dizon, Ananda Sarkar","doi":"10.2118/207976-ms","DOIUrl":null,"url":null,"abstract":"\n Crude storage tanks are an important asset in every oil company. Having adequate storage capacities is important economically and ensure steady supply of oil in the market. Hence, taking a huge tank out of service for refurbishment is technically and safety critical, and as much as putting it back into service on time.\n This paper presents an advanced methodology and assessment of tank refurbishment process of large capacity Crude Storage Tanks, in compliance with the International Codes and Standards resulting in optimization of the project schedule by approximately 40% as compared to conventional methodology of refurbishment. By deploying the advance techniques, detailed assessment, and dynamic planning we have been able to accelerate the completion of the project, improve tank availability time without compromising with the Integrity and HSE.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207976-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Crude storage tanks are an important asset in every oil company. Having adequate storage capacities is important economically and ensure steady supply of oil in the market. Hence, taking a huge tank out of service for refurbishment is technically and safety critical, and as much as putting it back into service on time. This paper presents an advanced methodology and assessment of tank refurbishment process of large capacity Crude Storage Tanks, in compliance with the International Codes and Standards resulting in optimization of the project schedule by approximately 40% as compared to conventional methodology of refurbishment. By deploying the advance techniques, detailed assessment, and dynamic planning we have been able to accelerate the completion of the project, improve tank availability time without compromising with the Integrity and HSE.
采用先进技术,原油储罐翻新周期缩短40%
原油储罐是每个石油公司的重要资产。拥有足够的储存能力在经济上具有重要意义,并能确保市场上石油的稳定供应。因此,从技术上和安全上来说,让一个巨大的储罐退役进行翻新是至关重要的,同样重要的是让它按时重新投入使用。本文提出了一种先进的方法和评估大容量原油储罐的储罐翻新过程,符合国际规范和标准,与传统的翻新方法相比,项目进度优化了约40%。通过采用先进的技术、详细的评估和动态规划,我们能够在不影响完整性和HSE的情况下加速项目的完成,提高储罐的可用时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信