{"title":"Scoping studies for net","authors":"K. Borrass","doi":"10.1016/0167-899X(87)90008-5","DOIUrl":null,"url":null,"abstract":"<div><p>Scoping studies for NET using the SUPERCOIL system code are described. Capital cost optimized devices satisfying constraints imposed on stresses/strains, fields, access, etc. are compared. The main objectives are to determine what impact the main design characteristics, performance objectives and underlying plasma physics assumptions have on the parameters and cost of NET. A complete picture for choosing the main parameters of NET is developed and illustrated by the main NET study points used during the conceptual design phase.</p></div>","PeriodicalId":82205,"journal":{"name":"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy","volume":"4 2","pages":"Pages 247-264"},"PeriodicalIF":0.0000,"publicationDate":"1987-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-899X(87)90008-5","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167899X87900085","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
Scoping studies for NET using the SUPERCOIL system code are described. Capital cost optimized devices satisfying constraints imposed on stresses/strains, fields, access, etc. are compared. The main objectives are to determine what impact the main design characteristics, performance objectives and underlying plasma physics assumptions have on the parameters and cost of NET. A complete picture for choosing the main parameters of NET is developed and illustrated by the main NET study points used during the conceptual design phase.