{"title":"Flood Loss Assessment - A Case Study of Dordi Basin, Gandaki, Province","authors":"S. K. Chaudhari","doi":"10.3126/jes.v9i1.56477","DOIUrl":null,"url":null,"abstract":"Hydropower plants are a quintessential source of clean and economical energy, serving as the primary preference for renewable energy technologies for many governments owing to their unparalleled ability to deliver dependable baseload power with negligible fluctuation. However, despite their numerous benefits, the construction and operation of these plants pose a significant threat to the population living in the river basin and the equipment involved. The damage caused by flooding can have devastating and long-lasting impacts on the area, leading to severe economic losses and a prolonged period of recovery. In the case of the Dordi Rural Municipality, a study was carried out, which revealed that the Upper Dordi Hydropower Plant Headwork and Super Dordi Hydropower Plant inlet were ravaged by a ruinous flood, which resulted in the loss of twenty million equipment and eleven workers die. The cause of the flood was attributed to the upstream landslide blockage, which eventually led to the sudden bursting of the blockage and subsequent flooding. While the compensation of the workers was provided by the District Administration Office, Lamjung, and Dordi Rural Municipality through their incurrence policy, the study underscores the urgent need to establish a highly frequent flood warning system to alert the hydropower station and the local community. Additionally, the scouring and deposition process in the river channel was observed in detail, and the data analysis indicates no significant relationship between discharge and rainfall, emphasizing the importance of proactive measures to prevent future flooding events.","PeriodicalId":87298,"journal":{"name":"Journal of environment and health sciences","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of environment and health sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/jes.v9i1.56477","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Hydropower plants are a quintessential source of clean and economical energy, serving as the primary preference for renewable energy technologies for many governments owing to their unparalleled ability to deliver dependable baseload power with negligible fluctuation. However, despite their numerous benefits, the construction and operation of these plants pose a significant threat to the population living in the river basin and the equipment involved. The damage caused by flooding can have devastating and long-lasting impacts on the area, leading to severe economic losses and a prolonged period of recovery. In the case of the Dordi Rural Municipality, a study was carried out, which revealed that the Upper Dordi Hydropower Plant Headwork and Super Dordi Hydropower Plant inlet were ravaged by a ruinous flood, which resulted in the loss of twenty million equipment and eleven workers die. The cause of the flood was attributed to the upstream landslide blockage, which eventually led to the sudden bursting of the blockage and subsequent flooding. While the compensation of the workers was provided by the District Administration Office, Lamjung, and Dordi Rural Municipality through their incurrence policy, the study underscores the urgent need to establish a highly frequent flood warning system to alert the hydropower station and the local community. Additionally, the scouring and deposition process in the river channel was observed in detail, and the data analysis indicates no significant relationship between discharge and rainfall, emphasizing the importance of proactive measures to prevent future flooding events.
洪涝灾害损失评估——以甘达基省多地流域为例
水力发电厂是清洁和经济能源的典型来源,由于其提供可靠的基本负荷电力且波动可以忽略不计的无与伦比的能力,许多政府将其作为可再生能源技术的首选。然而,尽管这些工厂有许多好处,但它们的建设和运营对生活在流域的人口和相关设备构成了重大威胁。洪水造成的破坏可能对该地区造成毁灭性和持久的影响,导致严重的经济损失和漫长的恢复期。就Dordi农村自治市而言,进行了一项研究,结果显示,上Dordi水电站的水头和超级Dordi水电站的进水口遭到毁灭性洪水的破坏,导致2000万设备损失,11名工人死亡。洪水发生的原因是上游滑坡淤塞,最终导致淤塞突然决口,引发洪水。虽然这些工人的赔偿金是由地区行政办公室、Lamjung和Dordi农村市政府根据他们的灾害政策提供的,但该研究强调,迫切需要建立一个频繁的洪水预警系统,向水电站和当地社区发出警报。此外,对河道的冲刷和沉积过程进行了详细的观测,数据分析表明流量与降雨量之间没有显著的关系,强调了采取积极措施预防未来洪水事件的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信