Analisis Rencana Anggaran Biaya Pada Proyek Peningkatan Jalan Aur Duri – Rantau Unji (A.Hotmix) Tahap III Sepanjang 3,2 Km Kota Pagar Alam

Sahiman Sahiman, Fameira Dhiniati
{"title":"Analisis Rencana Anggaran Biaya Pada Proyek Peningkatan Jalan Aur Duri – Rantau Unji (A.Hotmix) Tahap III Sepanjang 3,2 Km Kota Pagar Alam","authors":"Sahiman Sahiman, Fameira Dhiniati","doi":"10.36050/berings.v3i1.114","DOIUrl":null,"url":null,"abstract":"Planning a building must be in accordance with the form and can be useful in its use, and the amount of costs in accordance with the initial calculation. The Budget Plan is planning a building in the form and benefit of its use, along with the necessary costs and implementation arrangements in the field of administration and work implementation in the technical field. The steps taken to calculate the building cost budget plan are identify each existing work item in the project being calculated. In this research the researcher calculates the estimate cost plan with the Bina Marga method, making Work Plan and Terms and time schedule. The research problem formulation is How to calculate the existing budget plan and make a time schedule. The research objective is to calculate the existing estimate cost plan, make a Time Schedule (S Curve) and Work Plan and Terms. The budget plan for the improvement project of Aur Duri - Rantau Unji (a.hotmix) phase III of 2014 is 3.2 km in Pagar Alam City for the general division of Rp. 31,160,000.00, and the total work price of Rp. 1,988,684,545 54, - rounded the amount of Rp. 1,988,684,000.00, -","PeriodicalId":17796,"journal":{"name":"JURNAL ILMIAH BERING'S","volume":"40 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2016-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL ILMIAH BERING'S","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36050/berings.v3i1.114","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Planning a building must be in accordance with the form and can be useful in its use, and the amount of costs in accordance with the initial calculation. The Budget Plan is planning a building in the form and benefit of its use, along with the necessary costs and implementation arrangements in the field of administration and work implementation in the technical field. The steps taken to calculate the building cost budget plan are identify each existing work item in the project being calculated. In this research the researcher calculates the estimate cost plan with the Bina Marga method, making Work Plan and Terms and time schedule. The research problem formulation is How to calculate the existing budget plan and make a time schedule. The research objective is to calculate the existing estimate cost plan, make a Time Schedule (S Curve) and Work Plan and Terms. The budget plan for the improvement project of Aur Duri - Rantau Unji (a.hotmix) phase III of 2014 is 3.2 km in Pagar Alam City for the general division of Rp. 31,160,000.00, and the total work price of Rp. 1,988,684,545 54, - rounded the amount of Rp. 1,988,684,000.00, -
分析了Aur thorroad改进项目的成本预算计划——Rantau Unji (A.Hotmix)第三级电网长3.2公里(2英里)
规划一座建筑物必须按照其形式和用途,并按照其费用数额进行初步计算。预算计划正在规划建筑物的形式和使用效益,以及行政领域和技术领域的工作执行方面的必要费用和执行安排。计算建筑成本预算计划所采取的步骤是确定正在计算的项目中的每个现有工作项。在本研究中,研究者使用比纳玛加法计算估算成本计划,制定工作计划和条款以及时间表。研究的问题是如何计算现有的预算计划并制定时间表。研究的目的是计算现有的估算成本计划,制定时间表(S曲线)和工作计划和条款。2014年Aur Duri - Rantau Unji (a.hotmix)三期改善工程的预算计划是在Pagar Alam市3.2公里,总划分为Rp. 31,160,000.00,总工程价格为Rp. 1,988,684,54554, -四舍金额为Rp. 1,988,684,000.00, -
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信