Health and Safety Integration into the Procurement Stages of Public Construction Projects in Developing Countries: A Case of Ghana

IF 1.8 Q3 MANAGEMENT
Elijah Frimpong Boadu, R. Sunindijo, C. Wang, Samuel Frimpong
{"title":"Health and Safety Integration into the Procurement Stages of Public Construction Projects in Developing Countries: A Case of Ghana","authors":"Elijah Frimpong Boadu, R. Sunindijo, C. Wang, Samuel Frimpong","doi":"10.5130/ajceb.v22i3.8136","DOIUrl":null,"url":null,"abstract":"The potential to promote health and safety (H&S) through public procurement has resulted in increased expectation for public sector clients to integrate H&S matters into their procurement decisions and practices. Developing countries are however far behind in this endeavour. Using qualitative research, therefore, this study explored how public clients integrate H&S into the procurement of public works. Data was collected through semi-structured interviews with 20 contractors and public sector clients who have vast experience in the procurement of public works. The data was analysed using both inductive and deductive thematic analyses. The findings show that the extent of H&S integration into the procurement process depended on the funding source(s) for public projects. H&S matters are generally overlooked in the various procurement stages for public projects funded by the government, while in those funded by international development agencies, H&S matters are prioritized, and therefore, given considerable attention. The research contributes to construction H&S improvement research in developing countries by giving insight into the extent of H&S integration into public procurement. It also contributes to the understanding of the influence of funding sources on the extent to which H&S matters are integrated into public procurement in developing countries.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2022-09-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Economics and Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/ajceb.v22i3.8136","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

The potential to promote health and safety (H&S) through public procurement has resulted in increased expectation for public sector clients to integrate H&S matters into their procurement decisions and practices. Developing countries are however far behind in this endeavour. Using qualitative research, therefore, this study explored how public clients integrate H&S into the procurement of public works. Data was collected through semi-structured interviews with 20 contractors and public sector clients who have vast experience in the procurement of public works. The data was analysed using both inductive and deductive thematic analyses. The findings show that the extent of H&S integration into the procurement process depended on the funding source(s) for public projects. H&S matters are generally overlooked in the various procurement stages for public projects funded by the government, while in those funded by international development agencies, H&S matters are prioritized, and therefore, given considerable attention. The research contributes to construction H&S improvement research in developing countries by giving insight into the extent of H&S integration into public procurement. It also contributes to the understanding of the influence of funding sources on the extent to which H&S matters are integrated into public procurement in developing countries.
发展中国家公共建设项目采购阶段的健康与安全整合:以加纳为例
由于有可能通过公共采购促进健康和安全,因此人们越来越期望公共部门客户将健康和安全问题纳入其采购决策和做法。然而,发展中国家在这方面远远落后。因此,本研究采用质性研究,探讨公共客户如何将H&S纳入公共工程采购。数据是通过半结构化访谈方式收集的,访谈对象包括20家在公共工程采购方面经验丰富的承建商和公营机构客户。数据分析使用归纳和演绎主题分析。研究结果表明,卫生与安全纳入采购过程的程度取决于公共项目的资金来源。在政府资助的公共项目的各个采购阶段,卫生与安全问题通常被忽视,而在国际发展机构资助的公共项目中,卫生与安全问题被优先考虑,因此受到相当大的关注。该研究通过深入了解卫生与安全纳入公共采购的程度,有助于发展中国家的建筑卫生与安全改进研究。它还有助于了解资金来源对发展中国家将卫生与安全事项纳入公共采购的程度的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.80
自引率
6.20%
发文量
0
审稿时长
20 weeks
期刊介绍: Construction Economics and Building (formerly known as the Australasian Journal of Construction Economics and Building [AJCEB]) is a peer reviewed, open access publication for original research into all aspects of the economics and management of building and construction, quantity surveying and property management as well as construction and property education. It is free for authors, readers and libraries.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信