THE MULTI-FACTOR CONTROL AND EVALUATION OF HIGHWAY SOFT SOIL SUBGRADE STABILITY

Ming-yi Zhang, Nannan Li, Min Yang
{"title":"THE MULTI-FACTOR CONTROL AND EVALUATION OF HIGHWAY SOFT SOIL SUBGRADE STABILITY","authors":"Ming-yi Zhang, Nannan Li, Min Yang","doi":"10.14311/cej.2022.03.0032","DOIUrl":null,"url":null,"abstract":"When the surcharge preloading method is used in the treatment of soft soil subgrade, it is necessary to squeeze for more preloading drainage consolidation time under the premise of controlling the subgrade stability during the filling period. Considering the mutation of each monitoring indices and their interrelation when instability occurs in the fill subgrade, the inflection point analysis method through monitoring indices to control the subgrade stability comprehensively was proposed in this paper. The thin-layer rotary adding method was used to determine the ultimate filling depth and the loading plan for the highway soft soil subgrade during the filling period, with the inflection point analysis method in analyzing and evaluating the subgrade stability. The results showed that: (1) The ultimate fill height of the subgrade sections was obtained from the stability analysis results on the basis of the three indices of pore water pressure increment, settlement and lateral displacement, which was close to the prediction results of the thin-layer rotary adding method. (2) The stability control standard of the subgrade construction in the filling method was that the single-stage pore pressure coefficient should be within 1.2. (3) The subgrade stability control standard contained the maximum settlement rate of 20mm/d and the maximum lateral displacement rate of 3mm/d. (4) The geotextile setting in the highway subgrade effectively improved the ultimate bearing capacity of the subgrade, reduced the lateral displacement, improved the anti-slip stability, and increased the ultimate filling height and filling rate.","PeriodicalId":21974,"journal":{"name":"Stavební obzor - Civil Engineering Journal","volume":"146 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Stavební obzor - Civil Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14311/cej.2022.03.0032","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

When the surcharge preloading method is used in the treatment of soft soil subgrade, it is necessary to squeeze for more preloading drainage consolidation time under the premise of controlling the subgrade stability during the filling period. Considering the mutation of each monitoring indices and their interrelation when instability occurs in the fill subgrade, the inflection point analysis method through monitoring indices to control the subgrade stability comprehensively was proposed in this paper. The thin-layer rotary adding method was used to determine the ultimate filling depth and the loading plan for the highway soft soil subgrade during the filling period, with the inflection point analysis method in analyzing and evaluating the subgrade stability. The results showed that: (1) The ultimate fill height of the subgrade sections was obtained from the stability analysis results on the basis of the three indices of pore water pressure increment, settlement and lateral displacement, which was close to the prediction results of the thin-layer rotary adding method. (2) The stability control standard of the subgrade construction in the filling method was that the single-stage pore pressure coefficient should be within 1.2. (3) The subgrade stability control standard contained the maximum settlement rate of 20mm/d and the maximum lateral displacement rate of 3mm/d. (4) The geotextile setting in the highway subgrade effectively improved the ultimate bearing capacity of the subgrade, reduced the lateral displacement, improved the anti-slip stability, and increased the ultimate filling height and filling rate.
公路软土路基稳定性的多因素控制与评价
采用堆载预压法处理软土地基时,在控制填筑期路基稳定性的前提下,需要挤压更多的预压排水固结时间。考虑到填方路基发生失稳时各监测指标的突变及其相互关系,提出了利用监测指标拐点分析法对路基稳定性进行综合控制的方法。采用薄层旋加法确定公路软土路基的极限填土深度和填土期间的加载方案,采用拐点分析法对路基稳定性进行分析评价。结果表明:(1)基于孔隙水压力增量、沉降和侧向位移3个指标的稳定性分析结果得到路基断面的极限填土高度,与薄层旋转加填法的预测结果接近。(2)填筑法路基施工稳定性控制标准为单级孔隙压力系数应在1.2以内。(3)路基稳定性控制标准的最大沉降速率为20mm/d,最大侧向位移速率为3mm/d。(4)在公路路基中设置土工布,有效提高了路基的极限承载力,减小了路基的侧向位移,提高了路基的抗滑稳定性,提高了路基的极限填充高度和填充率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信