{"title":"The post-evaluation of an engineering project via AHP","authors":"Z. Sinuany-Stern, A. Amitai","doi":"10.1109/PICMET.1991.183632","DOIUrl":null,"url":null,"abstract":"The authors discuss the post-evaluation of a large engineering project in Beer-Sheva, Israel, in which a new production line was constructed using new technology to produce a new cleaning detergent. In this post-evaluation, half of the evaluators graded the project as a success, while the other half as a failure. But after using the analytical hierarchy (AHP), considering several attributes, the overall grade of grade of each evaluator was high. The six attributes used were: meeting the schedule, meeting the budget, how closely the original design was followed, performance quality, level of design, and the level of maintenance and accessibility of parts.<<ETX>>","PeriodicalId":22349,"journal":{"name":"Technology Management : the New International Language","volume":"6 1","pages":"275-277"},"PeriodicalIF":0.0000,"publicationDate":"1991-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technology Management : the New International Language","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.1991.183632","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
The authors discuss the post-evaluation of a large engineering project in Beer-Sheva, Israel, in which a new production line was constructed using new technology to produce a new cleaning detergent. In this post-evaluation, half of the evaluators graded the project as a success, while the other half as a failure. But after using the analytical hierarchy (AHP), considering several attributes, the overall grade of grade of each evaluator was high. The six attributes used were: meeting the schedule, meeting the budget, how closely the original design was followed, performance quality, level of design, and the level of maintenance and accessibility of parts.<>