Pipeline Modelling for the Lebanese Offshore: Cases in the Oil and Gas Industry

August 1985 Pub Date : 2022-08-01 DOI:10.48103/jjeci582022
Rami Harkouss
{"title":"Pipeline Modelling for the Lebanese Offshore: Cases in the Oil\nand Gas Industry","authors":"Rami Harkouss","doi":"10.48103/jjeci582022","DOIUrl":null,"url":null,"abstract":"Lebanon must build a pipeline system to carry the hydrocarbons from offshore to the shore. With no available studies and not much experience in this domain, designing a pipeline system in Lebanon is a topic of great concern. In this research, a prototype sample for the Lebanese offshore pipeline system is designed taking into consideration different parameters such as the drainage area, skin factor, Dietz shape, production interval, and the wellhead pressure. The system carries the gas from block 9 offshore Lebanon to a suitable production platform using different simulation software, mainly PROSPER. Different scenarios are modelled where results showed an optimum flow rate of 322.834MMscf/day and a wellbore pressure of 6460.73psi at 3000psi wellhead pressure. Further studies are encouraged to be carried out to transport the hydrocarbons from the wellheads of block 9 to the Zahrani processing plant via specified hydraulics engineering software.","PeriodicalId":8656,"journal":{"name":"August 1985","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"August 1985","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.48103/jjeci582022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Lebanon must build a pipeline system to carry the hydrocarbons from offshore to the shore. With no available studies and not much experience in this domain, designing a pipeline system in Lebanon is a topic of great concern. In this research, a prototype sample for the Lebanese offshore pipeline system is designed taking into consideration different parameters such as the drainage area, skin factor, Dietz shape, production interval, and the wellhead pressure. The system carries the gas from block 9 offshore Lebanon to a suitable production platform using different simulation software, mainly PROSPER. Different scenarios are modelled where results showed an optimum flow rate of 322.834MMscf/day and a wellbore pressure of 6460.73psi at 3000psi wellhead pressure. Further studies are encouraged to be carried out to transport the hydrocarbons from the wellheads of block 9 to the Zahrani processing plant via specified hydraulics engineering software.
黎巴嫩海上管道建模:石油和天然气工业案例
黎巴嫩必须建立一个管道系统,将碳氢化合物从海上输送到岸上。由于在这一领域没有现成的研究和经验,在黎巴嫩设计管道系统是一个非常值得关注的话题。在本研究中,设计了黎巴嫩海上管道系统的原型样品,考虑了不同的参数,如排水面积、表皮因子、Dietz形状、生产间隔和井口压力。该系统使用不同的模拟软件(主要是PROSPER)将天然气从黎巴嫩海上9区块输送到合适的生产平台。模拟了不同的场景,结果表明,在3000psi井口压力下,最佳流量为322.834MMscf/天,井筒压力为6460.73psi。鼓励开展进一步的研究,通过特定的液压工程软件将碳氢化合物从9区块的井口输送到Zahrani加工厂。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信