Schedule risk analysis in construction project using RFMEA and Bayesian networks: The Cali-Colombia case study

C. A. Mican, V. Jimenez, J. Perez, J. Borrero
{"title":"Schedule risk analysis in construction project using RFMEA and Bayesian networks: The Cali-Colombia case study","authors":"C. A. Mican, V. Jimenez, J. Perez, J. Borrero","doi":"10.1109/IEEM.2013.6962445","DOIUrl":null,"url":null,"abstract":"The projects in the construction sector are developed in complex and dynamic circumstances due to uncertainties and risks. The schedule risk is the probability that the project exceeds the initial programming, for which several methodologies are proposed; on the other hand very few of them have been used in countries where the economies are in development. This paper presents a case study of the construction industry in the city of Cali-Colombia, integrating the RMFEA prioritization method and the Bayesian Networks model for the schedule risk analysis in construction projects. It will be possible to identify the main own risks in this type of projects and the impact that they have in the probability of finishing the project on time.","PeriodicalId":6454,"journal":{"name":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"36 1","pages":"415-419"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2013.6962445","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The projects in the construction sector are developed in complex and dynamic circumstances due to uncertainties and risks. The schedule risk is the probability that the project exceeds the initial programming, for which several methodologies are proposed; on the other hand very few of them have been used in countries where the economies are in development. This paper presents a case study of the construction industry in the city of Cali-Colombia, integrating the RMFEA prioritization method and the Bayesian Networks model for the schedule risk analysis in construction projects. It will be possible to identify the main own risks in this type of projects and the impact that they have in the probability of finishing the project on time.
基于RFMEA和贝叶斯网络的建设项目进度风险分析:以加州-哥伦比亚项目为例
由于不确定性和风险,建筑行业的项目是在复杂和动态的环境中开发的。进度风险是指项目超出初始规划的可能性,为此提出了几种方法;另一方面,经济处于发展阶段的国家很少使用这些工具。本文以加州-哥伦比亚市建筑行业为例,将RMFEA优先排序方法与贝叶斯网络模型相结合,进行建筑项目进度风险分析。识别这类项目的主要风险以及它们对按时完成项目的可能性的影响是可能的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信