Accelerated Development of Subsurface Safety Valve Technologies

Edwards Jason
{"title":"Accelerated Development of Subsurface Safety Valve Technologies","authors":"Edwards Jason","doi":"10.4043/31218-ms","DOIUrl":null,"url":null,"abstract":"\n Described is a methodology for accelerating the development of innovative and high-risk technologies, specifically, subsurface safety valve technologies. Focus is on methods of mitigating technical and commercial risks that can delay or prevent successful development of new technologies. Example risk assessment and risk mitigation strategies are provided from a recent subsurface safety valve technology development project. Mitigation strategies include fixture level testing, design changes, and deep client collaboration. In the example project, it is estimated that the total development time was reduced by as much as 50% by implementing these strategies. While a subsurface safety valve development is used in this example, it is believed that many strategies are applicable to other domains.","PeriodicalId":10936,"journal":{"name":"Day 2 Tue, August 17, 2021","volume":"194 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, August 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31218-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Described is a methodology for accelerating the development of innovative and high-risk technologies, specifically, subsurface safety valve technologies. Focus is on methods of mitigating technical and commercial risks that can delay or prevent successful development of new technologies. Example risk assessment and risk mitigation strategies are provided from a recent subsurface safety valve technology development project. Mitigation strategies include fixture level testing, design changes, and deep client collaboration. In the example project, it is estimated that the total development time was reduced by as much as 50% by implementing these strategies. While a subsurface safety valve development is used in this example, it is believed that many strategies are applicable to other domains.
加速发展地下安全阀技术
本文描述了一种加速创新和高风险技术开发的方法,特别是地下安全阀技术。重点是减轻可能延迟或阻止新技术成功开发的技术和商业风险的方法。最近的一个地下安全阀技术开发项目提供了风险评估和风险缓解策略的示例。缓解策略包括夹具级测试、设计更改和深度客户端协作。在示例项目中,通过实施这些策略,估计总开发时间减少了多达50%。虽然在这个例子中使用了地下安全阀的开发,但相信许多策略也适用于其他领域。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信