Lionel Prost, Richard Andrews, C. Baffes, Jean-Paul Carneiro, B. Chase, A. Chen, E. Cullerton, P. Derwent, J. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, C. Richard, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, V. Sista, J. Steimel, D. Sun, A. Warner
{"title":"PIP-II Injector Test Warm Front End: Commissioning Update","authors":"Lionel Prost, Richard Andrews, C. Baffes, Jean-Paul Carneiro, B. Chase, A. Chen, E. Cullerton, P. Derwent, J. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, C. Richard, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, V. Sista, J. Steimel, D. Sun, A. Warner","doi":"10.2172/1462073","DOIUrl":null,"url":null,"abstract":"The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.","PeriodicalId":8436,"journal":{"name":"arXiv: Accelerator Physics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"arXiv: Accelerator Physics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2172/1462073","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11
Abstract
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.