PIP-II Injector Test Warm Front End: Commissioning Update

Lionel Prost, Richard Andrews, C. Baffes, Jean-Paul Carneiro, B. Chase, A. Chen, E. Cullerton, P. Derwent, J. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, C. Richard, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, V. Sista, J. Steimel, D. Sun, A. Warner
{"title":"PIP-II Injector Test Warm Front End: Commissioning Update","authors":"Lionel Prost, Richard Andrews, C. Baffes, Jean-Paul Carneiro, B. Chase, A. Chen, E. Cullerton, P. Derwent, J. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, C. Richard, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, V. Sista, J. Steimel, D. Sun, A. Warner","doi":"10.2172/1462073","DOIUrl":null,"url":null,"abstract":"The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.","PeriodicalId":8436,"journal":{"name":"arXiv: Accelerator Physics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"arXiv: Accelerator Physics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2172/1462073","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
PIP-II喷油器测试暖前端:调试更新
费米实验室质子改进计划II喷射器试验的暖前端(WFE)已建成全长。它包括一个15毫安的直流,30千伏特的氢离子源,一个2米长的低能量束传输(LEBT),一个开关偶极磁铁,一个2.1 MeV的连续RFQ,然后是一个具有各种诊断和转储的中能量束传输(MEBT)。本报告介绍了调试状态,重点介绍了MEBT中的波束测量。特别是,具有注入助推器所需参数的光束(5 mA, 0.55 ms宏观脉冲,20 Hz)通过WFE传输。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信