Research and Implemention of System of Electric Business Expanding Installation Process Based on Graph Database

Junfeng Qiao, Aihua Zhou, Hongbin Qiu
{"title":"Research and Implemention of System of Electric Business Expanding Installation Process Based on Graph Database","authors":"Junfeng Qiao, Aihua Zhou, Hongbin Qiu","doi":"10.1109/AUTEEE50969.2020.9315680","DOIUrl":null,"url":null,"abstract":"The expansion and installation of electric transformer plays a very important role in the marketing management of electric company, which is closely related to the quality of electric services. With the rapid improvement of the level of science and technology, higher requirements are put forward for the expansion and installation of the electric industry. It is necessary for the expansion and installation of electric transformer to work out a more reasonable and efficient plan with the help of scientific and technological means. The graph database has technical advantages of high efficiency of topological data organization, low redundancy of topological data storage, strong expansibility of topological data model and high efficiency of topological analysis and calculation, which can meet the needs of rapid topological analysis and efficient calculation in the expansion and installation of electric transformer. The results show that the auxiliary system based on graph database can greatly improve the service quality of electric company.","PeriodicalId":6767,"journal":{"name":"2020 IEEE 3rd International Conference on Automation, Electronics and Electrical Engineering (AUTEEE)","volume":"25 1","pages":"10-13"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 3rd International Conference on Automation, Electronics and Electrical Engineering (AUTEEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEEE50969.2020.9315680","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The expansion and installation of electric transformer plays a very important role in the marketing management of electric company, which is closely related to the quality of electric services. With the rapid improvement of the level of science and technology, higher requirements are put forward for the expansion and installation of the electric industry. It is necessary for the expansion and installation of electric transformer to work out a more reasonable and efficient plan with the help of scientific and technological means. The graph database has technical advantages of high efficiency of topological data organization, low redundancy of topological data storage, strong expansibility of topological data model and high efficiency of topological analysis and calculation, which can meet the needs of rapid topological analysis and efficient calculation in the expansion and installation of electric transformer. The results show that the auxiliary system based on graph database can greatly improve the service quality of electric company.
基于图数据库的电商扩容安装流程系统的研究与实现
变压器的扩建和安装在电力公司的营销管理中起着非常重要的作用,它与电力服务质量密切相关。随着科学技术水平的迅速提高,对电气工业的扩建和安装提出了更高的要求。变压器的扩建和安装,有必要借助科技手段制定出更加合理、高效的方案。图数据库具有拓扑数据组织效率高、拓扑数据存储冗余度低、拓扑数据模型可扩展性强、拓扑分析计算效率高等技术优势,能够满足电力变压器扩容安装中快速拓扑分析和高效计算的需要。结果表明,基于图形数据库的辅助系统可以大大提高电力公司的服务质量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书