{"title":"A hybrid delayed differentiation multiproduct EPQ model with scrap and end-products multi-shipment policy","authors":"Yuan-Shyi Peter Chiu, Ya-Lei Lo, Tsu-Ming Yeh, Yunsen Wang, Hung-Yi Chen","doi":"10.5267/j.ijiec.2022.11.002","DOIUrl":null,"url":null,"abstract":"The present work intends to optimize a hybrid delayed differentiation multiproduct economic production quantity-EPQ model with the scrap and end-products multi-shipment policy. Since the requirements of multi-goods have a standard part in common, our fabrication planning adopts a two-phase delayed differentiation strategy to make the standard components first and produce the finished multi-goods in the second phase. Implementing a partial subcontracting option (with the additional expense) for the standard parts helps us to expedite the required uptime in the first phase. A screening process identifies the faulty items that need to be removed to ensure the in-house production quality. A multi-shipment plan delivers the finished lot of end-products to clients in fixed time intervals. This study optimizes the overall operating expenses of this intra-supply chain system, including fabrication, delivery, and client stock holding, through our proposed modeling, formulation, and optimization procedure. In addition, this study gives a numerical demonstration of the obtained results’ applicability and usefulness to managerial decision-making.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"1 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2022.11.002","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0
Abstract
The present work intends to optimize a hybrid delayed differentiation multiproduct economic production quantity-EPQ model with the scrap and end-products multi-shipment policy. Since the requirements of multi-goods have a standard part in common, our fabrication planning adopts a two-phase delayed differentiation strategy to make the standard components first and produce the finished multi-goods in the second phase. Implementing a partial subcontracting option (with the additional expense) for the standard parts helps us to expedite the required uptime in the first phase. A screening process identifies the faulty items that need to be removed to ensure the in-house production quality. A multi-shipment plan delivers the finished lot of end-products to clients in fixed time intervals. This study optimizes the overall operating expenses of this intra-supply chain system, including fabrication, delivery, and client stock holding, through our proposed modeling, formulation, and optimization procedure. In addition, this study gives a numerical demonstration of the obtained results’ applicability and usefulness to managerial decision-making.