COMPARISON OF THE RESULTS OF NUMERICAL SIMULATION OF MEASUREMENT OF SCRAM-SYSTEM EFFICIENCY AND MEASUREMENT PERFORMED DURING THE REACTOR PHYSICAL STARTUP TESTS OF UNITS 1, 2 NOVOVORONEZH-2 NPP AND UNIT 1 LENINGRAD-2 NPP
V. Kulikov, N. Zhylmaganbetov, A. Popykin, A. Smirnova, L. Kryakvin, V. Pitilimov, O. Sedov, V. Tereshonok, R. Sizov
{"title":"COMPARISON OF THE RESULTS OF NUMERICAL SIMULATION OF MEASUREMENT OF SCRAM-SYSTEM EFFICIENCY AND MEASUREMENT PERFORMED DURING THE REACTOR PHYSICAL STARTUP TESTS OF UNITS 1, 2 NOVOVORONEZH-2 NPP AND UNIT 1 LENINGRAD-2 NPP","authors":"V. Kulikov, N. Zhylmaganbetov, A. Popykin, A. Smirnova, L. Kryakvin, V. Pitilimov, O. Sedov, V. Tereshonok, R. Sizov","doi":"10.55176/2414-1038-2020-3-80-87","DOIUrl":null,"url":null,"abstract":"The article represents the results of measurement and numerical simulation of measurement of scram-system efficiency of reactor plants performed during the reactor physical startup tests of Novovoronezh-2 units 1, 2 and Leningrad-2 unit 1. These power units are equipped with a reactor VVER-1200, therefore, one numerical simulation of measurement of scram-system efficiency on the basis of the reactor project was performed. The article represents comparisons of the calculated and the measured currents of the ionization chambers and the readings of reactimeter calculate for them during measurement of scram-system efficiency.","PeriodicalId":20426,"journal":{"name":"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55176/2414-1038-2020-3-80-87","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The article represents the results of measurement and numerical simulation of measurement of scram-system efficiency of reactor plants performed during the reactor physical startup tests of Novovoronezh-2 units 1, 2 and Leningrad-2 unit 1. These power units are equipped with a reactor VVER-1200, therefore, one numerical simulation of measurement of scram-system efficiency on the basis of the reactor project was performed. The article represents comparisons of the calculated and the measured currents of the ionization chambers and the readings of reactimeter calculate for them during measurement of scram-system efficiency.