Factorial Causative Assesments and Effects of Building ConstructionProject Delays in Osun State, Nigeria

Olusola Adekunle, W. KareemAjibola
{"title":"Factorial Causative Assesments and Effects of Building ConstructionProject Delays in Osun State, Nigeria","authors":"Olusola Adekunle, W. KareemAjibola","doi":"10.4172/2168-9717.1000150","DOIUrl":null,"url":null,"abstract":"Delay in building construction project is a universal phenomenon that is not peculiar to Osun alone. In fact, all countries of the world are faced with this global issue. These delays are usually considered as costly to all parties concerned in the projects and very often results in total abandonment thereby slowing down the growth of the construction sector. The purpose of this study was to assess the causative factors of delays and their effects on building construction projects in Osun. A total of forty two (42) project delay attributes and seventeen (17) effect attributes were identified through detailed literature review. Questionnaire survey were conducted across stakeholders that included among others; consultants, contractors and clients cutting across the building professionals namely; Architects, Builders, Quantity Surveyors, Estate Surveyors and Engineers to gather their views on causes of delay in delivery of projects. The research categorized the causes of delay under four main groups of client related, consultant related, contractor related and delay caused by incidental factors and their effects assessed using relative importance index (RII) as a basis for analysis. The RII for all delay factors and group of categories was computed so as to rank the factors. A total of 260 questionnaires were distributed among the respondents from different building construction firm in Osun state. Out of 260 questionnaires distributed, 234 valid questionnaires were retrieved back from the respondents, representing a response rate of (90.0%). The validation of information in this study yielded a Cronbach’s alpha of 0.891. The most significant factors of construction delays were identified as: cash flow problem (delay payment) with (RII=0.89), incomplete drawings (RII=0.84), improper planning and scheduling problem (RII=0.91), financial incapability (RII=0.89) and force majeure (Acts of God) with (RII=0.81). The study revealed that overall, contractor-caused delays ranked highest with (RII=0.91) and was attributed to improper planning and scheduling problem, followed by financial incapability (RII=0.89), while client-caused delay attributed to cash flow problem (delay payment) (RII=0.89) was observed as the second most common cause of delay in building construction project in Osun state. Furthermore, the study revealed increase in final cost of project (RII=0.88) and extension of time on project (RII=0.80), as the top two (2) effects of delays in building construction project in Osun state, while cash flow (RII=0.52) had the least effect. It is therefore believed that identification of the causes of potential delay factors that are likely to affect the timely delivery of projects can help to avoid extra costs through claims and disputes that arise among parties when delays are experienced.","PeriodicalId":15092,"journal":{"name":"Journal of Architectural Engineering Technology","volume":"5 1","pages":"1-8"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Architectural Engineering Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4172/2168-9717.1000150","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

Delay in building construction project is a universal phenomenon that is not peculiar to Osun alone. In fact, all countries of the world are faced with this global issue. These delays are usually considered as costly to all parties concerned in the projects and very often results in total abandonment thereby slowing down the growth of the construction sector. The purpose of this study was to assess the causative factors of delays and their effects on building construction projects in Osun. A total of forty two (42) project delay attributes and seventeen (17) effect attributes were identified through detailed literature review. Questionnaire survey were conducted across stakeholders that included among others; consultants, contractors and clients cutting across the building professionals namely; Architects, Builders, Quantity Surveyors, Estate Surveyors and Engineers to gather their views on causes of delay in delivery of projects. The research categorized the causes of delay under four main groups of client related, consultant related, contractor related and delay caused by incidental factors and their effects assessed using relative importance index (RII) as a basis for analysis. The RII for all delay factors and group of categories was computed so as to rank the factors. A total of 260 questionnaires were distributed among the respondents from different building construction firm in Osun state. Out of 260 questionnaires distributed, 234 valid questionnaires were retrieved back from the respondents, representing a response rate of (90.0%). The validation of information in this study yielded a Cronbach’s alpha of 0.891. The most significant factors of construction delays were identified as: cash flow problem (delay payment) with (RII=0.89), incomplete drawings (RII=0.84), improper planning and scheduling problem (RII=0.91), financial incapability (RII=0.89) and force majeure (Acts of God) with (RII=0.81). The study revealed that overall, contractor-caused delays ranked highest with (RII=0.91) and was attributed to improper planning and scheduling problem, followed by financial incapability (RII=0.89), while client-caused delay attributed to cash flow problem (delay payment) (RII=0.89) was observed as the second most common cause of delay in building construction project in Osun state. Furthermore, the study revealed increase in final cost of project (RII=0.88) and extension of time on project (RII=0.80), as the top two (2) effects of delays in building construction project in Osun state, while cash flow (RII=0.52) had the least effect. It is therefore believed that identification of the causes of potential delay factors that are likely to affect the timely delivery of projects can help to avoid extra costs through claims and disputes that arise among parties when delays are experienced.
尼日利亚奥逊州建筑施工项目延误的因因评估和影响
建筑工程拖延是普遍现象,并不是只有奥善一个特例。事实上,世界各国都面临着这一全球性问题。这些延误通常被认为对项目有关各方都是代价高昂的,而且往往导致完全放弃,从而减缓了建筑部门的增长。本研究的目的是评估造成延误的因素及其对奥顺市建筑工程的影响。通过详细的文献回顾,共确定了42个项目延迟属性和17个效果属性。对包括其他在内的利益相关者进行问卷调查;顾问公司、承建商和客户,即:建筑师、建造商、工料测量师、产业测量师及工程师就工程项目延误的原因收集意见。研究将延误的原因分为与客户相关的、与顾问相关的、与承包商相关的和由偶然因素引起的延误四大类,并以相对重要性指数(relative importance index, RII)作为分析的基础来评估其影响。计算所有延迟因素和类别组的RII,从而对因素进行排序。在奥松州不同建筑公司的受访者中共分发了260份问卷。在发放的260份问卷中,回收有效问卷234份,回复率为90.0%。本研究资料验证的Cronbach 's alpha为0.891。确定施工延误最显著的因素为:现金流问题(延迟付款)(RII=0.89),图纸不完整(RII=0.84),规划和调度不当问题(RII=0.91),财务能力(RII=0.89)和不可抗力(不可抗力)(RII=0.81)。研究显示,总体而言,承包商造成的延迟排名最高(RII=0.91),归因于不适当的计划和调度问题,其次是财务能力(RII=0.89),而客户造成的延迟归因于现金流问题(延迟付款)(RII=0.89)被观察到是奥孙州建筑建设项目延迟的第二大常见原因。此外,研究发现奥松州建筑建设项目延迟的影响最大的是项目最终成本增加(RII=0.88)和项目时间延长(RII=0.80),而现金流量(RII=0.52)的影响最小。因此,人们认为,查明可能影响项目及时交付的潜在延误因素的原因,有助于避免在经历延误时各方之间因索赔和纠纷而产生的额外费用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信