Toe Initiation Sleeve With Time-Delay Functionality Improves Operational Efficiency of Offshore NCS Wells

Cathrine Mehus, V. Keerthivasan, T. Koløy, D. Young, Tore Sørheim
{"title":"Toe Initiation Sleeve With Time-Delay Functionality Improves Operational Efficiency of Offshore NCS Wells","authors":"Cathrine Mehus, V. Keerthivasan, T. Koløy, D. Young, Tore Sørheim","doi":"10.2118/206268-ms","DOIUrl":null,"url":null,"abstract":"\n A toe initiation sleeve is a tool installed in the toe of a completion liner and is used to establish a flowpath to the reservoir without the use of intervention. Conventional toe initiation sleeves require either intervention or increasing pressure to higher than the liner test pressure to activate. These methods have inherent cost and operational risks. This paper will present the development, qualification, and deployment of a multicycle, time-delay cementable toe initiation sleeve that allows for interventionless activation without exceeding the liner test pressure. This development greatly improves operational efficiency and eliminates risk associated with conventional toe initiation sleeves.\n A major operator in the North Sea required an ISO V0 rated toe initiation sleeve to be developed and qualified. Design criteria for the tool was identified, and the design was developed based on field-qualified seal technology. Individual component and full-scale validation testing was performed to complete the product qualification, followed by field trials in 2019. With its unique time-delay feature, the newly developed ATS (Advanced Toe Sleeve) allows for an unlimited number of pressure cycles to be performed while also keeping the well V0 barrier in place, and activates at below liner test pressure.\n This paper will discuss the technology development and implementation project, resulting in ISO 14998 V0-qualified cemented ATS being installed in nearly 40 wells in the same field. This paper will also provide insight into how the ATS provides unique benefits to the operator during various phases of the well's life.\n Cementing: One moving part and opening sleeve isolated from the inside diameter (ID) allow for pumping darts through the ATS without the risk of opening Setting liner/testing liner: Time-delay features allow for setting liner and testing the liner at higher pressures than ATS opening pressure. Well cleanup/displacing to lower density fluid: Time-delay function allows for opening the ATS at lower pressure than the well has seen during previous operations. Completion: ATS design and qualification grade reduce completion steps and costs for the operator. Stimulation: ATS eliminates the need for intervention, reducing the operational steps and costs for the operator.\n The advanced toe sleeve with built-in time-delay features maintains the liner integrity throughout the various well operations. The number of available pressure cycles can be predetermined, and the activation of the various cycles can be precisely controlled thereby also controlling when the tool is activated to achieve injectivity. This paper will present the development and field-wide implementation of the ATS technology, which has rapidly gained operator acceptance and resulted in significant time and cost savings.","PeriodicalId":10928,"journal":{"name":"Day 2 Wed, September 22, 2021","volume":"50 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, September 22, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206268-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A toe initiation sleeve is a tool installed in the toe of a completion liner and is used to establish a flowpath to the reservoir without the use of intervention. Conventional toe initiation sleeves require either intervention or increasing pressure to higher than the liner test pressure to activate. These methods have inherent cost and operational risks. This paper will present the development, qualification, and deployment of a multicycle, time-delay cementable toe initiation sleeve that allows for interventionless activation without exceeding the liner test pressure. This development greatly improves operational efficiency and eliminates risk associated with conventional toe initiation sleeves. A major operator in the North Sea required an ISO V0 rated toe initiation sleeve to be developed and qualified. Design criteria for the tool was identified, and the design was developed based on field-qualified seal technology. Individual component and full-scale validation testing was performed to complete the product qualification, followed by field trials in 2019. With its unique time-delay feature, the newly developed ATS (Advanced Toe Sleeve) allows for an unlimited number of pressure cycles to be performed while also keeping the well V0 barrier in place, and activates at below liner test pressure. This paper will discuss the technology development and implementation project, resulting in ISO 14998 V0-qualified cemented ATS being installed in nearly 40 wells in the same field. This paper will also provide insight into how the ATS provides unique benefits to the operator during various phases of the well's life. Cementing: One moving part and opening sleeve isolated from the inside diameter (ID) allow for pumping darts through the ATS without the risk of opening Setting liner/testing liner: Time-delay features allow for setting liner and testing the liner at higher pressures than ATS opening pressure. Well cleanup/displacing to lower density fluid: Time-delay function allows for opening the ATS at lower pressure than the well has seen during previous operations. Completion: ATS design and qualification grade reduce completion steps and costs for the operator. Stimulation: ATS eliminates the need for intervention, reducing the operational steps and costs for the operator. The advanced toe sleeve with built-in time-delay features maintains the liner integrity throughout the various well operations. The number of available pressure cycles can be predetermined, and the activation of the various cycles can be precisely controlled thereby also controlling when the tool is activated to achieve injectivity. This paper will present the development and field-wide implementation of the ATS technology, which has rapidly gained operator acceptance and resulted in significant time and cost savings.
具有延时功能的趾尖起裂滑套提高了海上NCS井的作业效率
趾部启动滑套是一种安装在完井尾管趾部的工具,用于在不使用干预的情况下建立通往储层的流动通道。传统的脚趾启动滑套需要干预或将压力增加到高于尾管测试压力才能启动。这些方法具有固有的成本和操作风险。本文将介绍一种多周期、延时固井趾启动滑套的开发、鉴定和部署,该滑套允许在不超过尾管测试压力的情况下进行无干预激活。该技术极大地提高了作业效率,并消除了与传统套管相关的风险。北海的一家大型作业者要求开发并通过ISO V0等级的脚趾起裂滑套。确定了该工具的设计标准,并根据现场合格的密封技术进行了设计。进行了单个组件和全面验证测试以完成产品认证,随后在2019年进行了现场试验。凭借其独特的延时特性,新开发的ATS(高级趾套)允许无限次的压力循环,同时保持井的V0屏障,并在低于尾管测试压力的情况下激活。本文将讨论技术开发和实施项目,从而在同一油田的近40口井中安装了符合ISO 14998 v0标准的固井ATS。本文还将深入介绍ATS如何在井的各个阶段为作业者提供独特的优势。固井:一个与内径(ID)隔离的活动部件和开口滑套允许通过ATS泵送镖,而不会有打开坐封尾管/测试尾管的风险;延时特性允许在高于ATS开启压力的压力下坐封尾管和测试尾管。井清洗/驱替至低密度流体:延时功能允许在较低压力下打开ATS,而不是在之前的作业中看到的压力。完井:ATS的设计和资质等级为作业者减少了完井步骤和成本。增产作业:ATS无需进行干预,减少了作业步骤,降低了作业成本。内置延时功能的先进趾套在各种井作业中保持尾管的完整性。可用压力循环的数量可以预先确定,并且可以精确控制各种循环的激活,从而也可以控制何时激活工具以实现注入。本文将介绍ATS技术的开发和现场应用,该技术迅速获得了运营商的认可,并节省了大量的时间和成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信