{"title":"Evaluating the effect of accelerated construction method on project life cycle cost","authors":"M. El-Far, R. Sabry, M. Kotb","doi":"10.1680/jinam.23.00021","DOIUrl":null,"url":null,"abstract":"Construction contributes to cities development. In Egypt, many projects had established using the accelerated method (ACM), others were traditional (TCM). Their life cycle cost (LCC) is analyzed to determine the benefit cost (BC) and decide the construction optimum way. In this paper, a Comparative study between LCC of ACM and TCM was held to improve the decision-making to form reasonable judgments on projects’ economics throughout their life cycle. The main question is what is the optimum way of construction to reach the highest benefit cost? Mustafa El-Nahass axis in Cairo studied, using LCC analysis to determine the development BC by analyzing the traffic impact before and after development. It was considered that operation cost (OC) of the axis were fuel and exhaust. Savings from OC by the ACM expressed by the case study BC. The main findings are that government entities should develop guidelines establishing the maximum time for construction. According to a prior study, extending construction time had no detrimental impact on public interest in these places. LCC study of the project was used to estimate this limit. This code specifies the regions to be classified based on traffic and population, and the maximum time for construction.","PeriodicalId":43387,"journal":{"name":"Infrastructure Asset Management","volume":"60 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructure Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jinam.23.00021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

Abstract

Construction contributes to cities development. In Egypt, many projects had established using the accelerated method (ACM), others were traditional (TCM). Their life cycle cost (LCC) is analyzed to determine the benefit cost (BC) and decide the construction optimum way. In this paper, a Comparative study between LCC of ACM and TCM was held to improve the decision-making to form reasonable judgments on projects’ economics throughout their life cycle. The main question is what is the optimum way of construction to reach the highest benefit cost? Mustafa El-Nahass axis in Cairo studied, using LCC analysis to determine the development BC by analyzing the traffic impact before and after development. It was considered that operation cost (OC) of the axis were fuel and exhaust. Savings from OC by the ACM expressed by the case study BC. The main findings are that government entities should develop guidelines establishing the maximum time for construction. According to a prior study, extending construction time had no detrimental impact on public interest in these places. LCC study of the project was used to estimate this limit. This code specifies the regions to be classified based on traffic and population, and the maximum time for construction.
加速施工法对项目全生命周期成本的影响评价
建设促进城市发展。在埃及,许多项目采用了加速法(ACM),其他项目采用了传统法(TCM)。对其全寿命周期成本进行分析,确定效益成本,确定施工优化方式。本文将ACM的LCC与TCM的LCC进行比较研究,以改进决策,形成对项目全生命周期经济的合理判断。主要的问题是什么是施工的最佳方式,以达到最高的效益成本?Mustafa El-Nahass axis在开罗进行了研究,通过分析开发前后的交通影响,使用LCC分析来确定开发BC。认为轴的运行成本为燃料和废气。ACM从OC节省的费用通过案例研究BC表示。主要结论是,政府实体应制定指导方针,确定最长施工时间。根据先前的一项研究,延长施工时间对这些地方的公共利益没有不利影响。利用项目的LCC研究来估计这一极限。该规范规定了根据交通和人口以及最长建设时间进行分类的地区。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
2.70
自引率
14.30%
发文量
18
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信