{"title":"Using multiple time-series analysis, of assembly-line production of automobile engines — a case study","authors":"Toni M. Somers, Yash P. Gupta","doi":"10.1016/0167-188X(91)90005-M","DOIUrl":null,"url":null,"abstract":"<div><p>In recent years researchers have dealt with multiple time series problems in practically meaningful ways. In this paper, the assembly-line data of a major producer of automobile engines is analyzed and multivariate models are constructed and estimated to investigate the relationship among weekly engine production, downtime and the man-hours worked. The assembly line is operated on a Just-In-Time basis for normally two shifts per five day week. Such an analysis could help them in developing contingency plans consistent with their obligations to the automobile manufacturer they supplied.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":"21 3","pages":"Pages 243-258"},"PeriodicalIF":0.0000,"publicationDate":"1991-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(91)90005-M","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9190005M","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
In recent years researchers have dealt with multiple time series problems in practically meaningful ways. In this paper, the assembly-line data of a major producer of automobile engines is analyzed and multivariate models are constructed and estimated to investigate the relationship among weekly engine production, downtime and the man-hours worked. The assembly line is operated on a Just-In-Time basis for normally two shifts per five day week. Such an analysis could help them in developing contingency plans consistent with their obligations to the automobile manufacturer they supplied.