Delay Study in the Construction Project: An Overview

Shubham Sharma, M. Pandey, S. Agrawal
{"title":"Delay Study in the Construction Project: An Overview","authors":"Shubham Sharma, M. Pandey, S. Agrawal","doi":"10.9790/9622-0707012123","DOIUrl":null,"url":null,"abstract":"Scheduling” is the word when it came in our mind it means the time table and most important thing is that, works should be done in time, but even if we try everything to keep our time table in schedule some of the factors that cause us late by increasing our time, they are called “DELAY FACTOR” and the time increase by them, known as “DELAY”. DELAY is the factor which is responsible for every other factors which cause lose of time, money etc. especially the most prominent loss of time and money causes by delay factors is in construction. Today construction growth in the world is increasing day by day. In every part of the world an ongoing construction can be seen, so it is very important to keep every construction on time, but quite often it is not possible because many sub-factors from different main factors cause delay and keep the construction behind the time in comparison of schedule time. The main focus of this paper is to determine the current and most responsible Delay factors by methods of MCDM and by arranging and listing them, with the recommendation to minimizing them.","PeriodicalId":13972,"journal":{"name":"International Journal of Engineering Research and Applications","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9790/9622-0707012123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Scheduling” is the word when it came in our mind it means the time table and most important thing is that, works should be done in time, but even if we try everything to keep our time table in schedule some of the factors that cause us late by increasing our time, they are called “DELAY FACTOR” and the time increase by them, known as “DELAY”. DELAY is the factor which is responsible for every other factors which cause lose of time, money etc. especially the most prominent loss of time and money causes by delay factors is in construction. Today construction growth in the world is increasing day by day. In every part of the world an ongoing construction can be seen, so it is very important to keep every construction on time, but quite often it is not possible because many sub-factors from different main factors cause delay and keep the construction behind the time in comparison of schedule time. The main focus of this paper is to determine the current and most responsible Delay factors by methods of MCDM and by arranging and listing them, with the recommendation to minimizing them.
建设项目延迟研究综述
“日程安排”这个词出现在我们的脑海里,它的意思是时间表,最重要的是,工作应该按时完成,但即使我们尽一切努力保持我们的时间表在时间表上,一些因素会导致我们迟到,增加我们的时间,他们被称为“延迟因素”和时间增加,被称为“延迟”。延误是造成时间、金钱等损失的所有其他因素的原因,特别是由延误因素引起的时间和金钱损失最突出的是在施工中。今天,世界上的建筑增长日益增加。在世界的每一个地方都可以看到一个正在进行的建设,所以保持每一个建设按时是非常重要的,但往往是不可能的,因为来自不同主要因素的许多子因素导致延误,使建设落后于计划时间。本文的主要重点是通过MCDM方法确定当前和最重要的延迟因素,并通过排列和列出它们,并建议最小化它们。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信