{"title":"Simulation of the Operation of a Borehole Groundwater Intake with an Annular Prefabricated Conduit","authors":"V. V. Veremenyuk, V. V. Ivashechkin, V. I. Krytskaya","doi":"10.21122/1029-7448-2023-66-3-289-300","DOIUrl":null,"url":null,"abstract":"Among the considered options for schemes of prefabricated water conduits of borehole water intakes, the main ones are linear and ring schemes. The article presents a comparative analysis of the linear and ring schemes for the placement of prefabricated water conduits when choosing an option for designing a group well water intake with a circular arrangement of wells. It is founded that a small water intake with individual radial connections to the prefabricated unit can have advantages in reducing energy consumption for water transportation as compared to a water intake with an annular prefabricated conduit, which in any case should be justified by a feasibility comparison of options, which is based on hydraulic calculation water supply systems. Equations have been obtained for calculating the pumping rates of water intake wells with linear prefabricated conduits. It is shown that in an annular prefabricated conduit, in contrast to a linear one, in which the direction of movement of water flows is unambiguously known, there is always a point of separation of two flows directed along the ring to the prefabricated unit clockwise and counterclockwise, which makes it difficult to calculate such water intakes. Moreover, the position of this point depends on the number of water intake wells involved in the work and the parameters of the pipes connecting the sections of the water conduit. The absence of algorithms for calculating the ring prefabricated conduit with non-fixed flow rates at the well connection points complicates the hydraulic calculation, and, hence, finding the optimal water intake option. The article presents an algorithm for the hydraulic calculation of a water intake with a single-ring prefabricated conduit, which is based on the equation for the equality of pressure losses when water moves from the point of separation of two flows to the prefabricated unit along various paths and the continuity equation. The resulting algorithm can be easily extended to any number of wells. A numerical example of the hydraulic calculation of a group water intake, consisting of eight wells connected to an annular prefabricated, is considered.","PeriodicalId":52141,"journal":{"name":"Energetika. Proceedings of CIS Higher Education Institutions and Power Engineering Associations","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energetika. Proceedings of CIS Higher Education Institutions and Power Engineering Associations","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21122/1029-7448-2023-66-3-289-300","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Energy","Score":null,"Total":0}
引用次数: 0

Abstract

Among the considered options for schemes of prefabricated water conduits of borehole water intakes, the main ones are linear and ring schemes. The article presents a comparative analysis of the linear and ring schemes for the placement of prefabricated water conduits when choosing an option for designing a group well water intake with a circular arrangement of wells. It is founded that a small water intake with individual radial connections to the prefabricated unit can have advantages in reducing energy consumption for water transportation as compared to a water intake with an annular prefabricated conduit, which in any case should be justified by a feasibility comparison of options, which is based on hydraulic calculation water supply systems. Equations have been obtained for calculating the pumping rates of water intake wells with linear prefabricated conduits. It is shown that in an annular prefabricated conduit, in contrast to a linear one, in which the direction of movement of water flows is unambiguously known, there is always a point of separation of two flows directed along the ring to the prefabricated unit clockwise and counterclockwise, which makes it difficult to calculate such water intakes. Moreover, the position of this point depends on the number of water intake wells involved in the work and the parameters of the pipes connecting the sections of the water conduit. The absence of algorithms for calculating the ring prefabricated conduit with non-fixed flow rates at the well connection points complicates the hydraulic calculation, and, hence, finding the optimal water intake option. The article presents an algorithm for the hydraulic calculation of a water intake with a single-ring prefabricated conduit, which is based on the equation for the equality of pressure losses when water moves from the point of separation of two flows to the prefabricated unit along various paths and the continuity equation. The resulting algorithm can be easily extended to any number of wells. A numerical example of the hydraulic calculation of a group water intake, consisting of eight wells connected to an annular prefabricated, is considered.
环形预制管道钻孔取水口运行模拟
在考虑的钻孔取水口预制水管方案中,主要有线性方案和环形方案。本文在选择一种圆形井群取水口设计方案时,对预制水管的线性布置方案和环形布置方案进行了比较分析。研究发现,与环形预制管道的取水口相比,单个径向连接到预制单元的小型取水口在减少水运能耗方面具有优势,在任何情况下,都应该通过基于水力计算供水系统的可行性比较来证明这一点。得到了线性预制管道取水井抽水量的计算公式。结果表明,在环形预制管道中,水流的运动方向是明确的,而在线性管道中,两股水流沿着环形顺时针和逆时针方向流向预制单元,总有一个分离点,这使得计算这种进水量变得困难。此外,该点的位置取决于工程中涉及的取水井的数量和连接水管段的管道的参数。由于缺乏计算非固定流量的环形预制管道的算法,使得水力计算变得复杂,因此很难找到最佳的取水方案。本文根据水从两流分离点沿不同路径流向预制单元时的压力损失相等方程和连续性方程,提出了单环预制管道进水口水力计算的一种算法。所得到的算法可以很容易地扩展到任意数量的井。本文考虑了一组取水口水力计算的数值实例,该取水口由8口井连接到环形预制构件。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.60
自引率
0.00%
发文量
32
审稿时长
8 weeks
期刊介绍: The most important objectives of the journal are the generalization of scientific and practical achievements in the field of power engineering, increase scientific and practical skills as researchers and industry representatives. Scientific concept publications include the publication of a modern national and international research and achievements in areas such as general energetic, electricity, thermal energy, construction, environmental issues energy, energy economy, etc. The journal publishes the results of basic research and the advanced achievements of practices aimed at improving the efficiency of the functioning of the energy sector, reduction of losses in electricity and heat networks, improving the reliability of electrical protection systems, the stability of the energetic complex, literature reviews on a wide range of energy issues.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信