{"title":"Possibilities for the industrial use of cooled geothermal brines by borehole salt mines in the Polish Lowlands","authors":"Marek Rasała","doi":"10.24425/118642","DOIUrl":null,"url":null,"abstract":"The paper presents the concept of thedisposal of cooled geothermal brines by re-use in borehole salt mines where they are further saturated with sodium chloride. The target recipients of the brines – saturated to reach industrial brine requirements – would be chemical plants. at present mines produce industrial-quality brine with surface water. Using the model options of cooperation of geothermal plants (a hypothetical plant in Mogilno and one under construction in Toruń) with salt mines (Przyjma and Góra), it follows shown that the payback period for major capital expenditures (drilling, pipeline) 10–15 years. The would provide tangible benefits for geothermal plants (elimination re-injection Mogilno plants parallel several and, they brine mines’ total geothermal 80–100 when","PeriodicalId":50416,"journal":{"name":"Gospodarka Surowcami Mineralnymi-Mineral Resources Management","volume":"12 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gospodarka Surowcami Mineralnymi-Mineral Resources Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.24425/118642","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MINERALOGY","Score":null,"Total":0}
引用次数: 0

Abstract

The paper presents the concept of thedisposal of cooled geothermal brines by re-use in borehole salt mines where they are further saturated with sodium chloride. The target recipients of the brines – saturated to reach industrial brine requirements – would be chemical plants. at present mines produce industrial-quality brine with surface water. Using the model options of cooperation of geothermal plants (a hypothetical plant in Mogilno and one under construction in Toruń) with salt mines (Przyjma and Góra), it follows shown that the payback period for major capital expenditures (drilling, pipeline) 10–15 years. The would provide tangible benefits for geothermal plants (elimination re-injection Mogilno plants parallel several and, they brine mines’ total geothermal 80–100 when
波兰低地钻孔盐矿工业使用冷却地热盐水的可能性
本文提出了冷却地热盐水在井内盐矿再利用的概念,在井内盐矿中,地热盐水被氯化钠进一步饱和。卤水的目标接收方是化工厂,这些卤水已经饱和,可以达到工业卤水的要求。目前矿山用地表水生产工业用卤水。利用地热发电厂(莫吉诺的一个假想电厂和托鲁瓦的一个正在建设中的电厂)与盐矿(普日马和Góra)合作的模式选项表明,主要资本支出(钻井、管道)的回收期为10-15年。这将为地热发电厂提供切实的好处(消除莫吉诺平行电厂的几次再注入),它们将盐矿的总地热量提高到80-100时
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.80
自引率
11.10%
发文量
0
审稿时长
>12 weeks
期刊介绍: Gospodarka Surowcami Mineralnymi – Mineral Resources Management is a journal of the MEERI PAS and the Committee for Sustainable Mineral Resources Management of the Polish Academy of Sciences. The journal has been published continuously since 1985. It is one of the leading journals in the Polish market, publishing original scientific papers by Polish and foreign authors in the field broadly understood as the management of mineral resources. Articles are published in English. All articles are reviewed by at least two independent reviewers (the Editorial Board selects articles according to the “double-blind review” principle).
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信