{"title":"Integrated Water Management for Lafarge Cement-Jordan","authors":"A. Hamaideh, A. Al-Omari, M. Sturm","doi":"10.5281/zenodo.1088196","DOIUrl":null,"url":null,"abstract":"This study aims at implementing integrated water resources management principles to the Lafarge Cement Jordan at Al-Fuhais plant. This was accomplished by conducting water audits at all water consuming units in the plant. Based on the findings of the water audit, an action plan to improve water use efficiency in the plant was proposed. The main elements of which are installing water saving devices, re-use of the treated wastewater, water harvesting, raising the awareness of the employees, and linking the plant to the water demand management unit at the Ministry of Water and Irrigation. The analysis showed that by implementing the proposed action plan, it is expected that the industrial water demand can be satisfied from non-conventional resources including treated wastewater and harvested water. As a consequence, fresh water can be used to increase the supply to Al-Fuhais city which is expected to reflect positively on the relationship between the factory and the city. Keywords—Integrated water resources management, nonconventional water resources, water awareness, water demand management, water harvesting, water saving devices.","PeriodicalId":23826,"journal":{"name":"World Academy of Science, Engineering and Technology, International Journal of Environmental, Chemical, Ecological, Geological and Geophysical Engineering","volume":"28 1","pages":"661-664"},"PeriodicalIF":0.0000,"publicationDate":"2013-09-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Academy of Science, Engineering and Technology, International Journal of Environmental, Chemical, Ecological, Geological and Geophysical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5281/zenodo.1088196","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This study aims at implementing integrated water resources management principles to the Lafarge Cement Jordan at Al-Fuhais plant. This was accomplished by conducting water audits at all water consuming units in the plant. Based on the findings of the water audit, an action plan to improve water use efficiency in the plant was proposed. The main elements of which are installing water saving devices, re-use of the treated wastewater, water harvesting, raising the awareness of the employees, and linking the plant to the water demand management unit at the Ministry of Water and Irrigation. The analysis showed that by implementing the proposed action plan, it is expected that the industrial water demand can be satisfied from non-conventional resources including treated wastewater and harvested water. As a consequence, fresh water can be used to increase the supply to Al-Fuhais city which is expected to reflect positively on the relationship between the factory and the city. Keywords—Integrated water resources management, nonconventional water resources, water awareness, water demand management, water harvesting, water saving devices.