O. M. Affendy, O.M.Affendy, M. F. Omardin, N.F Ishak, K.J.Abd Omar, F. Hamid, P. D. Mansur, N. A. Lau, M. Tutur, K. Mustafa, M. Mansor, Lee
{"title":"Conceptual Risk Assessment for New Township Infrastructure Expansion at Kuantan","authors":"O. M. Affendy, O.M.Affendy, M. F. Omardin, N.F Ishak, K.J.Abd Omar, F. Hamid, P. D. Mansur, N. A. Lau, M. Tutur, K. Mustafa, M. Mansor, Lee","doi":"10.15282/ijets.10.1.2023.1002","DOIUrl":null,"url":null,"abstract":"This paper intends to contribute about the risk assessment on New Township located at Kuantan. Researchers found that, it has a lot of risk that will occur at that area. Researchers found that it have 5 possible risk like disease, flooding, traffic risk, soil erosion and the improper drainage system. Then, researchers will choose the top 3 major risk to do the risk assessment. So, researchers choose traffic risk, soil erosion and the improper drainage system as our major risk in this project. Lastly, researchers also have implement the solution to solve the risk..","PeriodicalId":23608,"journal":{"name":"World Academy of Science, Engineering and Technology, International Journal of Medical and Health Sciences","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Academy of Science, Engineering and Technology, International Journal of Medical and Health Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15282/ijets.10.1.2023.1002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper intends to contribute about the risk assessment on New Township located at Kuantan. Researchers found that, it has a lot of risk that will occur at that area. Researchers found that it have 5 possible risk like disease, flooding, traffic risk, soil erosion and the improper drainage system. Then, researchers will choose the top 3 major risk to do the risk assessment. So, researchers choose traffic risk, soil erosion and the improper drainage system as our major risk in this project. Lastly, researchers also have implement the solution to solve the risk..