{"title":"Current meter methodology for discharge measurement in circular pipe","authors":"Cristian Purece, V. Panaitescu","doi":"10.1080/09715010.2022.2107879","DOIUrl":null,"url":null,"abstract":"ABSTRACT One of the main methods used for determining the discharge of a high head hydropower plant equipped with a circular penstock is the current meter method. The article presents a simple, but safe way to increase the accuracy of discharge measurement by means of the current meter method based on a new methodology for location velocity measuring points in the measuring section of a circular conduit. The proposed methodology utilizes the interdependence between the admissible interpolation and the radial distribution of the measuring points for diminishing the coincidence error, adopting the interpolation law proposed by Winternitz for this goal, a law that is both simple and whose calculation error is low. At the same time, the new methodology envisages increasing the number of intervals the admissible interpolating function domain is divided into through the measuring point lay out in a circular measuring section along a spiral considering that the interpolation error is inversely proportional to this number of intervals.","PeriodicalId":38206,"journal":{"name":"ISH Journal of Hydraulic Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ISH Journal of Hydraulic Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/09715010.2022.2107879","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

ABSTRACT One of the main methods used for determining the discharge of a high head hydropower plant equipped with a circular penstock is the current meter method. The article presents a simple, but safe way to increase the accuracy of discharge measurement by means of the current meter method based on a new methodology for location velocity measuring points in the measuring section of a circular conduit. The proposed methodology utilizes the interdependence between the admissible interpolation and the radial distribution of the measuring points for diminishing the coincidence error, adopting the interpolation law proposed by Winternitz for this goal, a law that is both simple and whose calculation error is low. At the same time, the new methodology envisages increasing the number of intervals the admissible interpolating function domain is divided into through the measuring point lay out in a circular measuring section along a spiral considering that the interpolation error is inversely proportional to this number of intervals.
圆管放电测量的电流计方法
采用圆形压力管的高水头水电厂流量测定的主要方法之一是流速计法。本文提出了一种在圆形管道测量段中定位测速点的新方法,提出了一种简单而安全的方法,即利用电流计法来提高放电测量的精度。所提出的方法利用可接受插值与测点径向分布之间的相互依赖关系来减小符合误差,为此采用了Winternitz提出的插值定律,该定律既简单又计算误差小。同时,考虑到插值误差与区间数成反比,该方法设想通过沿螺旋形圆形测量段布置的测点来增加可允许插值函数域的区间数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
ISH Journal of Hydraulic Engineering
ISH Journal of Hydraulic Engineering Engineering-Civil and Structural Engineering
CiteScore
4.30
自引率
0.00%
发文量
59
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信