The Sequence Optimization of the Railway Tree-Shaped Special Line's Shunting for Taking-out and Placing-in of Wagons

IF 1 4区 工程技术 Q3 ENGINEERING, MULTIDISCIPLINARY
LI Huan, Hongxu Chen, Yulin Wang
{"title":"The Sequence Optimization of the Railway Tree-Shaped Special Line's Shunting for Taking-out and Placing-in of Wagons","authors":"LI Huan, Hongxu Chen, Yulin Wang","doi":"10.17559/tv-20230127000274","DOIUrl":null,"url":null,"abstract":": Shunting for taking-out and placing-in of wagons (STPW) is an important work of freight stations, technical stations with more cargo operations, and large intermediate stations.The sequence optimization of STPW can effectively reduce the total shunting time and reduce operating costs, which is of great significance. When the optimization goal is to minimize the total shunting time, there will be many optimal solutions. Therefore, it is necessary to introduce a second optimization objective in order to seek a more reasonable solution from numerous optimal solutions. However, there is no relevant research on this in existing literature. In response to this situation, this paper proposes two optimization objectives: the first is to minimize the total time of STPW, and the second is to minimize the wagon-hour based on minimizing the total time of STPW. Based on the above two optimization objectives, a mathematical model is established, and a three-stage optimization solution strategy is proposed. The first stage is to solve the first optimization objective by using the improved ant colony algorithm; the second stage is to introduce and improve the crossover operation of the genetic algorithm to improve the diversity of the optimal path; the third stage is to solve the second optimization objective. Finally, an example is given to verify the feasibility of the model and the solution strategy.","PeriodicalId":49443,"journal":{"name":"Tehnicki Vjesnik-Technical Gazette","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2023-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tehnicki Vjesnik-Technical Gazette","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.17559/tv-20230127000274","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

: Shunting for taking-out and placing-in of wagons (STPW) is an important work of freight stations, technical stations with more cargo operations, and large intermediate stations.The sequence optimization of STPW can effectively reduce the total shunting time and reduce operating costs, which is of great significance. When the optimization goal is to minimize the total shunting time, there will be many optimal solutions. Therefore, it is necessary to introduce a second optimization objective in order to seek a more reasonable solution from numerous optimal solutions. However, there is no relevant research on this in existing literature. In response to this situation, this paper proposes two optimization objectives: the first is to minimize the total time of STPW, and the second is to minimize the wagon-hour based on minimizing the total time of STPW. Based on the above two optimization objectives, a mathematical model is established, and a three-stage optimization solution strategy is proposed. The first stage is to solve the first optimization objective by using the improved ant colony algorithm; the second stage is to introduce and improve the crossover operation of the genetic algorithm to improve the diversity of the optimal path; the third stage is to solve the second optimization objective. Finally, an example is given to verify the feasibility of the model and the solution strategy.
铁路树形专用线调车取车进站顺序优化
调车取车放车是货运站、货物作业较多的技术站和大型中间站的重要工作。STPW顺序优化可以有效缩短总调车时间,降低运行成本,具有重要意义。当优化目标是最小化总调车时间时,会有许多最优解。因此,有必要引入第二个优化目标,以便从众多最优解中寻求更合理的解。但在现有文献中并没有相关的研究。针对这种情况,本文提出了两个优化目标:一是使STPW总时间最小化,二是在最小化STPW总时间的基础上使车时最小化。基于上述两个优化目标,建立了数学模型,并提出了三阶段优化求解策略。第一阶段是利用改进的蚁群算法求解第一个优化目标;第二阶段是引入和改进遗传算法的交叉操作,提高最优路径的多样性;第三阶段是求解第二个优化目标。最后,通过实例验证了该模型和求解策略的可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Tehnicki Vjesnik-Technical Gazette
Tehnicki Vjesnik-Technical Gazette ENGINEERING, MULTIDISCIPLINARY-
CiteScore
1.90
自引率
11.10%
发文量
270
审稿时长
12.6 months
期刊介绍: The journal TEHNIČKI VJESNIK - TECHNICAL GAZETTE publishes scientific and professional papers in the area of technical sciences (mostly from mechanical, electrical and civil engineering, and also from their boundary areas). All articles have undergone peer review and upon acceptance are permanently free of all restrictions on access, for everyone to read and download. For all articles authors will be asked to pay a publication fee prior to the article appearing in the journal. However, this fee only to be paid after the article has been positively reviewed and accepted for publishing. All details can be seen at http://www.tehnicki-vjesnik.com/web/public/page First year of publication: 1994 Frequency (annually): 6
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信