{"title":"Cable Replacement Scheme for Low Tower Cable-Stayed Bridges Based on Sensitivity Analysis","authors":"Yang Zhao, WU Jun, Tongning Wang, Xin Cui, Xiusong Fu","doi":"10.17559/tv-20230227000385","DOIUrl":null,"url":null,"abstract":": Cable replacement is a key technique to solve the problems of cable corrosion and strand breakage. Cable removal causes structural changes. The choice of replacement method affects the safety of the bridge during cable replacement. A sensitivity analysis method was used to evaluate the force and deflection changes of Wohu Bridge. A reasonable method for the number and order of cable replacement was proposed; by comparing different cable removal schemes, it was revealed that the cable force and beam stress changes of the cables closest to the removed cable were the most significant. The results showed that the cable force increment of the surrounding cables was the largest when removing the longest cable. The structural impact change was small when removing the shortest cable. The maximum deflection at the top of the tower decreased with the decrease of the length of the removed cable. It was recommended to replace two cables symmetrically from the center of the tower, and the optimal replacement order was from the shortest cable to the longest cable. Furthermore, this paper also studied the influence of variable load on the cable replacement scheme, and demonstrated that the design scheme of opening part of traffic in this paper was safe and feasible.","PeriodicalId":49443,"journal":{"name":"Tehnicki Vjesnik-Technical Gazette","volume":"17 1","pages":""},"PeriodicalIF":1.0000,"publicationDate":"2023-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tehnicki Vjesnik-Technical Gazette","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.17559/tv-20230227000385","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

: Cable replacement is a key technique to solve the problems of cable corrosion and strand breakage. Cable removal causes structural changes. The choice of replacement method affects the safety of the bridge during cable replacement. A sensitivity analysis method was used to evaluate the force and deflection changes of Wohu Bridge. A reasonable method for the number and order of cable replacement was proposed; by comparing different cable removal schemes, it was revealed that the cable force and beam stress changes of the cables closest to the removed cable were the most significant. The results showed that the cable force increment of the surrounding cables was the largest when removing the longest cable. The structural impact change was small when removing the shortest cable. The maximum deflection at the top of the tower decreased with the decrease of the length of the removed cable. It was recommended to replace two cables symmetrically from the center of the tower, and the optimal replacement order was from the shortest cable to the longest cable. Furthermore, this paper also studied the influence of variable load on the cable replacement scheme, and demonstrated that the design scheme of opening part of traffic in this paper was safe and feasible.
基于灵敏度分析的低塔斜拉桥换缆方案
电缆更换是解决电缆腐蚀和断缆问题的关键技术。电缆的移除会导致结构的改变。更换电缆时更换方法的选择影响着桥架的安全性。采用敏感性分析方法对芜湖大桥的受力和挠度变化进行了分析。提出了一种合理的电缆更换次数和顺序的方法;通过对比不同的卸索方案,发现离卸索最近的索的索力和梁应力变化最为显著。结果表明:当拆除最长的电缆时,周围电缆的受力增量最大;拆除最短索时,结构冲击变化较小。塔顶最大挠度随脱缆长度的减小而减小。建议从塔中心对称更换两根电缆,最佳更换顺序为从最短电缆到最长电缆。此外,本文还研究了变荷载对电缆更换方案的影响,论证了本文提出的开通部分交通的设计方案是安全可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Tehnicki Vjesnik-Technical Gazette
Tehnicki Vjesnik-Technical Gazette ENGINEERING, MULTIDISCIPLINARY-
CiteScore
1.90
自引率
11.10%
发文量
270
审稿时长
12.6 months
期刊介绍: The journal TEHNIČKI VJESNIK - TECHNICAL GAZETTE publishes scientific and professional papers in the area of technical sciences (mostly from mechanical, electrical and civil engineering, and also from their boundary areas). All articles have undergone peer review and upon acceptance are permanently free of all restrictions on access, for everyone to read and download. For all articles authors will be asked to pay a publication fee prior to the article appearing in the journal. However, this fee only to be paid after the article has been positively reviewed and accepted for publishing. All details can be seen at http://www.tehnicki-vjesnik.com/web/public/page First year of publication: 1994 Frequency (annually): 6
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信