{"title":"Dynamic work plans and field analytics, the keys to cost-effective hazardous waste site investigations","authors":"Albert Robbat Jr., Sigurdur Smarason, Yuri Gankin","doi":"10.1002/(SICI)1520-6521(1998)2:5<253::AID-FACT2>3.0.CO;2-T","DOIUrl":null,"url":null,"abstract":"<p>The rapid assessment of environmental contaminants at hazardous waste sites is of great importance when evaluating the risk to human health or the environment. Traditional site investigations take years or even decades. Rather than dictate the details of the sampling and analysis program, the dynamic work plan focuses on the decision-making structure for sampling and analysis. The framework for conducting an adaptive sampling and analysis program at Hanscom Air Force Base (Bedford, MA) is described. Dynamic site investigation results are presented in the context of the field analytical tools employed, site decisions made, and cost. The data were used to support a soil-to-groundwater risk assessment and to optimize the groundwater/treatment facility operations. © 1998 John Wiley & Sons, Inc. Field Analyt Chem Technol 2:253–265, 1998</p>","PeriodicalId":100527,"journal":{"name":"Field Analytical Chemistry & Technology","volume":"2 5","pages":"253-265"},"PeriodicalIF":0.0000,"publicationDate":"1998-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1002/(SICI)1520-6521(1998)2:5<253::AID-FACT2>3.0.CO;2-T","citationCount":"18","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Field Analytical Chemistry & Technology","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/%28SICI%291520-6521%281998%292%3A5%3C253%3A%3AAID-FACT2%3E3.0.CO%3B2-T","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18
Abstract
The rapid assessment of environmental contaminants at hazardous waste sites is of great importance when evaluating the risk to human health or the environment. Traditional site investigations take years or even decades. Rather than dictate the details of the sampling and analysis program, the dynamic work plan focuses on the decision-making structure for sampling and analysis. The framework for conducting an adaptive sampling and analysis program at Hanscom Air Force Base (Bedford, MA) is described. Dynamic site investigation results are presented in the context of the field analytical tools employed, site decisions made, and cost. The data were used to support a soil-to-groundwater risk assessment and to optimize the groundwater/treatment facility operations. © 1998 John Wiley & Sons, Inc. Field Analyt Chem Technol 2:253–265, 1998
动态工作计划和现场分析,关键是具有成本效益的危险废物现场调查
在评估对人类健康或环境的风险时,对危险废物场址的环境污染物进行快速评估是非常重要的。传统的现场调查需要几年甚至几十年的时间。动态工作计划不是规定抽样和分析程序的细节,而是侧重于抽样和分析的决策结构。描述了在Hanscom空军基地(Bedford, MA)进行自适应采样和分析程序的框架。动态现场调查结果在现场分析工具的使用,现场决策和成本的背景下呈现。这些数据用于支持土壤对地下水的风险评估,并优化地下水/处理设施的操作。©1998 John Wiley &儿子,Inc。化学工程学报(英文版),1998
本文章由计算机程序翻译,如有差异,请以英文原文为准。