{"title":"Flow Assurance in Subsea Pipeline Design - A Case Study of Ghana’s Jubilee and TEN Fields","authors":"S. A. Marfo, Prince Opoku Appau, J. Acquah, E. M. Amarfio","doi":"10.4314/GM.V19I1.9","DOIUrl":null,"url":null,"abstract":"The increasing exploration and production activities in the offshore Cape Three Point Blocks of Ghana have led to the discovery and development of gas condensate fields in addition to the oil fields which produce significant amount of condensate gas. These discoveries require pipelines to transport the fluids avoiding hydrates and wax formation. This paper focuses on subsea pipeline design using Pipesim software that addresses flow assurance problems associated with transporting condensate gas from the Jubilee and TEN Fields to the Atuabo Gas Processing Plant. It also considered an alternate design that eliminates the need for capacity increase of flowlines for the futuristic highest projected flow rates in 2030. The design comprises of two risers and two flowlines. Hydrate formation temperature was determined to be 72.5 ˚F at a pressure of 3 000 psig. The insulation thickness for flowlines 1 and 2 were determined to be 1.5 in. and 2 in. respectively. The pipe size for flowlines 1 and 2 were determined to be 12 in. and 14 in. respectively. The maximum designed flow rate was determined to be 150 MMSCFD. To meet the highest projected flow rate of 700 MMSCFD in the year 2030 at the processing plant, a 16 in. ID pipeline of 44 km length was placed parallel to the 12 in. ID flowline 1. This parallel pipeline increased the designed flow rate by approximately 4.7 times (705 MMSCFD). The alternate design employs 18 in. and 20 in. ID pipes for flowlines 1 and 2 respectively. Keywords: Condensate Gas; Flowline; Flow Assurance; Hydrate; Pipesim","PeriodicalId":12530,"journal":{"name":"Ghana Mining Journal","volume":"51 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ghana Mining Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/GM.V19I1.9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The increasing exploration and production activities in the offshore Cape Three Point Blocks of Ghana have led to the discovery and development of gas condensate fields in addition to the oil fields which produce significant amount of condensate gas. These discoveries require pipelines to transport the fluids avoiding hydrates and wax formation. This paper focuses on subsea pipeline design using Pipesim software that addresses flow assurance problems associated with transporting condensate gas from the Jubilee and TEN Fields to the Atuabo Gas Processing Plant. It also considered an alternate design that eliminates the need for capacity increase of flowlines for the futuristic highest projected flow rates in 2030. The design comprises of two risers and two flowlines. Hydrate formation temperature was determined to be 72.5 ˚F at a pressure of 3 000 psig. The insulation thickness for flowlines 1 and 2 were determined to be 1.5 in. and 2 in. respectively. The pipe size for flowlines 1 and 2 were determined to be 12 in. and 14 in. respectively. The maximum designed flow rate was determined to be 150 MMSCFD. To meet the highest projected flow rate of 700 MMSCFD in the year 2030 at the processing plant, a 16 in. ID pipeline of 44 km length was placed parallel to the 12 in. ID flowline 1. This parallel pipeline increased the designed flow rate by approximately 4.7 times (705 MMSCFD). The alternate design employs 18 in. and 20 in. ID pipes for flowlines 1 and 2 respectively. Keywords: Condensate Gas; Flowline; Flow Assurance; Hydrate; Pipesim