Study on the Improved Severity Coefficient Model of Dam Break Consequence Assessment

Weiwei Sun, Qian Cai, Z. Long
{"title":"Study on the Improved Severity Coefficient Model of Dam Break Consequence Assessment","authors":"Weiwei Sun, Qian Cai, Z. Long","doi":"10.11648/J.AJCE.20210903.14","DOIUrl":null,"url":null,"abstract":"The assessment of the dam failure consequences is fundamental to the dam risk assessment, and the linear weight sum method is generally used. The comprehensive evaluation of dam failure consequences involves many evaluation factors, the dimensions of each factor are inconsistent. The key is to determine the coefficient of the severity degree of dam failure consequences. Based on the traditional methods, a new severity degree coefficient model of the loss of life, economic losses, environmental impact, and social impact is established after taking the current laws and regulations, the range of the severity of the impact, the establishment of normalized function, the introduction of piecewise function and other factors into comprehensive consideration, and use analysis hierarchy process to obtain weight. Apply the improved linear weighting method to the level assessment and rank of the dam failure consequences of Changlong reservoir, Xialan reservoir, Shibikeng reservoir, Longshan reservoir and Lingtan reservoir in Jiangxi Province, and then determine the grade and rank of dam failure consequences according to the calculation results, analyze the corresponding results accurately combined with expertise. The evaluation results and analysis show that if dam failure occurs, the consequences of the five dams are all very serious, it belongs to extraordinarily serious accidents. The severity degree coefficient of dam failure consequences model can reflect the severity degree of dam failure consequences more objectively and reasonably, and it has clear concept, simple calculation, and intuitive process.","PeriodicalId":7606,"journal":{"name":"American Journal of Civil Engineering","volume":"32 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"American Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/J.AJCE.20210903.14","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The assessment of the dam failure consequences is fundamental to the dam risk assessment, and the linear weight sum method is generally used. The comprehensive evaluation of dam failure consequences involves many evaluation factors, the dimensions of each factor are inconsistent. The key is to determine the coefficient of the severity degree of dam failure consequences. Based on the traditional methods, a new severity degree coefficient model of the loss of life, economic losses, environmental impact, and social impact is established after taking the current laws and regulations, the range of the severity of the impact, the establishment of normalized function, the introduction of piecewise function and other factors into comprehensive consideration, and use analysis hierarchy process to obtain weight. Apply the improved linear weighting method to the level assessment and rank of the dam failure consequences of Changlong reservoir, Xialan reservoir, Shibikeng reservoir, Longshan reservoir and Lingtan reservoir in Jiangxi Province, and then determine the grade and rank of dam failure consequences according to the calculation results, analyze the corresponding results accurately combined with expertise. The evaluation results and analysis show that if dam failure occurs, the consequences of the five dams are all very serious, it belongs to extraordinarily serious accidents. The severity degree coefficient of dam failure consequences model can reflect the severity degree of dam failure consequences more objectively and reasonably, and it has clear concept, simple calculation, and intuitive process.
溃坝后果评价的改进严重系数模型研究
溃坝后果评估是大坝风险评估的基础,一般采用线性权和法。溃坝后果综合评价涉及诸多评价因素,各评价因素的维度不一致。关键是确定溃坝后果严重程度系数。在传统方法的基础上,综合考虑现行法律法规、影响的严重程度范围、归一化函数的建立、分段函数的引入等因素,建立了新的生命损失、经济损失、环境影响和社会影响的严重程度系数模型,并利用层次分析法获得权重。将改进的线性加权法应用于江西省长龙水库、下兰水库、石壁坑水库、龙山水库、灵潭水库溃坝后果等级评价和等级排序,根据计算结果确定溃坝后果等级和等级,并结合专业知识对相应结果进行准确分析。评价结果和分析表明,如果发生溃坝,五座大坝的后果都很严重,属于特重事故。溃坝后果模型的严重程度系数能更客观合理地反映溃坝后果的严重程度,概念清晰,计算简单,过程直观。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信